My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#13 - Royal Golf Club 6th Addition Final Plat and PUD
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
04-02-24
>
#13 - Royal Golf Club 6th Addition Final Plat and PUD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2025 12:14:19 PM
Creation date
8/16/2024 2:14:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Ed Marchan ● Don Pereira ● John Brach ● Rick Gelbmann ● William Armstrong <br />P.O. Box 838 | Lake Elmo, MN 55042-0538 | www.vbwd.org <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />March 15, 2023 <br /> <br /> <br /> <br />Paul Tabone or Joe Jablonski <br />U.S. Home, LLC (Lennar) <br />16305 36th Avenue North, Suite 600 <br />Plymouth, MN 55446 <br /> <br />Re: Royal Golf Club 5th and 6th Additions—Lake Elmo, Minnesota <br /> VBWD Permit #2023-12 <br /> <br />Dear Messrs. Tabone and Jablonski: <br /> <br />Enclosed is the Valley Branch Watershed District (VBWD) permit for your project. <br />The Managers issued a permit for The Royal Golf Club at Lake Elmo on May 11, 2017. Lennar took <br />over a portion of the development and the Managers issued permit VBWD #2021-30 for that work. <br />The current proposal by Lennar is uniform to the original plan with minor revisions. <br />At the March 9, 2023 meeting the Managers approved VBWD Permit #2023-12 with the applicable <br />conditions of VBWD Permit #2021-30 remaining open for earlier phases of Lennar’s portion of the <br />development. Two additional conditions (#23 and #24) are added for VBWD Permit #2023-12. <br />Please note the following conditions imposed by the Managers, which are also listed on the back of <br />the permit. <br />1. Prior to work over the VBWD’s Project 1007 pipe: <br />a. The plans shall be revised and submitted for approval, including: <br />i. Replace the pipe with a higher-class pipe that can accommodate the proposed fill <br />depths, or <br />ii. Redesign the site or fill material (e.g., lightweight fill) to reduce the loading on the <br />pipe to meet the structural load requirements of the existing pipe and bedding. <br />b. The developer shall conduct and provide recordings of pre- and post-construction video <br />inspections of the entire VBWD Project 1007 pipe and structures with the site’s <br />construction limits.
The URL can be used to link to this page
Your browser does not support the video tag.