My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#13 - Royal Golf Club 6th Addition Final Plat and PUD
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
04-02-24
>
#13 - Royal Golf Club 6th Addition Final Plat and PUD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2025 12:14:19 PM
Creation date
8/16/2024 2:14:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Messrs. Tabone and Jablonski, U.S. Home, LLC (Lennar) <br />VBWD Permit #2023-12: Royal Golf Club 5th and 6th Additions <br />March 15, 2023 <br />Page 3 <br /> <br /> <br /> <br />10. Wetland buffer signage must be installed as required by the VBWD Rules and Regulations. <br />Specifications for the buffer vegetation and signs shall be submitted to and approved by the <br />VBWD prior to installation and planting. <br />11. This permit is not transferable. <br />12. This permit is subject to obtaining all other permits required by governmental agencies having <br />jurisdiction (including but not limited to an NPDES permit). <br />13. The VBWD Engineer and Inspector shall be notified at least 3 days prior to commencement of <br />work. <br />14. Erosion controls shall be installed prior to the commencement of grading operations and must <br />be maintained throughout the construction period until turf is established. Additional erosion <br />controls may be required, as directed by the VBWD Inspector or VBWD Engineer. <br />15. The following additional erosion controls shall be implemented on the site: <br />a. All proposed slopes 3-feet horizontal to 1-foot vertical (3H:1V) should be covered with <br />an erosion-control blanket. <br />b. Silt fence should follow existing contours as closely as feasible to limit the potential for <br />gully erosion along the edges. <br />c. Any sediment that collects in storm sewers, ponds, or other water-management <br />features shall be removed. <br />d. Street sweeping shall be performed if sediment collects on the streets. <br />e. If erosion occurs at the outlets of the storm sewer pipes, the applicant will be <br />responsible for correcting the problem to the satisfaction of the VBWD. <br />16. To prevent soil compaction, the proposed infiltration area shall be staked off and marked <br />during construction to prevent heavy equipment and traffic from traveling over it. If the <br />infiltration facility is in place during construction activities, sediment and runoff shall be kept <br />away from the facility, using practices such as diversion berms and vegetation around the <br />facility’s perimeter. The infiltration facility shall not be excavated to final grade until the <br />contributing drainage area has been constructed and fully stabilized. The final phase of <br />excavation shall remove all accumulated sediment and be done by light, tracked equipment to <br />avoid compaction of the basin floor. To provide a well-aerated, highly porous surface, the soils <br />of the basin floor shall be loosened to a depth of at least 24 inches to a maximum compaction <br />of 85% standard proctor density prior to planting. <br />17. All disturbed areas shall be vegetated within 14 days of final grading. <br />18. The applicant is responsible for removal of all temporary erosion-control measures, including <br />silt fence, upon establishment of permanent vegetation at the project site, as determined by <br />the VBWD Engineer and/or Inspector.
The URL can be used to link to this page
Your browser does not support the video tag.