My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#02 - Cross Walk Discussion
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
04-09-24 W
>
#02 - Cross Walk Discussion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2025 1:20:56 PM
Creation date
8/16/2024 2:15:42 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pedestrian Refuge Island <br />Source: www.pedbikeimages.com / TooleDesign <br />Benefits: <br />32% reduction in <br />pedestrian crashes <br />• Reduces pedestrian delay <br />• Reduces/eliminates multiple threat risk <br />• Reduces crossing distance <br />• May influence driver behavior by visually narrowing roadway <br />• Can be used with unmarked crosswalk <br />Best Locations: <br />• Multiple-lane roadways <br />• High-volume roadways <br />• High-speed roadways <br />• Inadequate visibility of pedestrians <br />• Vehicle speeds causing problems <br />Design Considerations: <br />• Island width: minimum of 4 feet <br />• Preferred island width: 8 feet <br />• Must facilitate drainage <br />• Accessibility: ADA-compliant ramps <br />Planning Level Cost (2019): <br />• $2,140 - $41,170, Average $13,520 <br />Source: FHWA
The URL can be used to link to this page
Your browser does not support the video tag.