My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#02 - Cross Walk Discussion
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
04-09-24 W
>
#02 - Cross Walk Discussion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2025 1:20:56 PM
Creation date
8/16/2024 2:15:42 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4-to-3 Lane Conversion <br />Benefits: <br />47%* <br /> <br />reduction in all crash types <br />*FHWA sites a range of 19 to 47% <br />• Provides opportunity for shoulder <br />and/or bike lane <br />• Reduces crossing distance <br />• Reduces risk of multiple threat crash <br />Best Locations: <br />• Roads that have 4 or more lanes without a raised median <br />• AADT less than 20,000 (most successful; but can also be successful <br />where AADT is greater than 20,000) <br />• Inadequate visibility of pedestrians <br />Design Considerations: <br />• Current and future vehicle operations <br />• Roadside stops (mail, trash, transit, etc.) <br />• Corridorwide considerations <br />Planning Level Cost (2019): <br />•$25,000 - $40,000/mile <br />Source: FHWA
The URL can be used to link to this page
Your browser does not support the video tag.