My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#04 - Royal Golf 6th Addition Development Agreement
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
05-07-24
>
#04 - Royal Golf 6th Addition Development Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2025 1:27:24 PM
Creation date
8/16/2024 2:20:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />LA515\135\943139.v2 <br />by the City unless the Subdivision is in full compliance with the approved erosion control plan. <br />If the City issues building permits before the acceptance of public Subdivision <br />Improvements, the Developer assumes all responsibility for erosion control compliance <br />throughout the Subdivision and the City may take such action as allowed by this Agreement <br />against the Developer for any noncompliant issue as stated above. Erosion control plans for <br />individual lots will be required in accordance with the City’s building permit requirements, or as <br />required by the City or City Engineer. <br />17. SITE GRADING. In order to construct the Subdivision Improvements and otherwise <br />prepare the Property for development, it will be necessary for the Developer to grade the <br />Subdivision. All grading must be done in compliance with this Agreement and the approved <br />grading plans. Within thirty (30) days after completion of the grading, the Developer shall provide <br />the City with an “as built” grading plan and a certification prepared by a registered land surveyor <br />or engineer as required in the City’s Engineering Design and Construction Standards Manual. <br />18. STREET AND UTILITY IMPROVEMENTS. All storm sewers, sanitary sewers, <br />sanitary sewer lift station, watermain, and streets, including turn lane and intersection <br />improvements, shall be installed in accordance with the approved Plans, the City approvals, the <br />City Code, and the City’s Engineering Design and Construction Standards Manual. Curb and <br />gutter, the first lift of the bituminous streets, sidewalks, boulevards graded, street signs installed, <br />and all restoration work on the site shall be completed in accordance with the approved Plans. <br />Once the work is completed, the Developer or the Developer’s representative shall submit a <br />written request to the City asking for an inspection of the initial improvements. The City will then <br />schedule a walk- through to create a punch list of outstanding items or repairs the Developer is <br />to complete. Upon receipt of the written punch list provided by the City, the Developer must <br />complete all items on the punch list and then notify the City to re-inspect the Improvements. The <br />Developer shall install the final bituminous wear course after the first bituminous course has
The URL can be used to link to this page
Your browser does not support the video tag.