Laserfiche WebLink
11 <br />LA515\135\943139.v2 <br />by the City unless the Subdivision is in full compliance with the approved erosion control plan. <br />If the City issues building permits before the acceptance of public Subdivision <br />Improvements, the Developer assumes all responsibility for erosion control compliance <br />throughout the Subdivision and the City may take such action as allowed by this Agreement <br />against the Developer for any noncompliant issue as stated above. Erosion control plans for <br />individual lots will be required in accordance with the City’s building permit requirements, or as <br />required by the City or City Engineer. <br />17. SITE GRADING. In order to construct the Subdivision Improvements and otherwise <br />prepare the Property for development, it will be necessary for the Developer to grade the <br />Subdivision. All grading must be done in compliance with this Agreement and the approved <br />grading plans. Within thirty (30) days after completion of the grading, the Developer shall provide <br />the City with an “as built” grading plan and a certification prepared by a registered land surveyor <br />or engineer as required in the City’s Engineering Design and Construction Standards Manual. <br />18. STREET AND UTILITY IMPROVEMENTS. All storm sewers, sanitary sewers, <br />sanitary sewer lift station, watermain, and streets, including turn lane and intersection <br />improvements, shall be installed in accordance with the approved Plans, the City approvals, the <br />City Code, and the City’s Engineering Design and Construction Standards Manual. Curb and <br />gutter, the first lift of the bituminous streets, sidewalks, boulevards graded, street signs installed, <br />and all restoration work on the site shall be completed in accordance with the approved Plans. <br />Once the work is completed, the Developer or the Developer’s representative shall submit a <br />written request to the City asking for an inspection of the initial improvements. The City will then <br />schedule a walk- through to create a punch list of outstanding items or repairs the Developer is <br />to complete. Upon receipt of the written punch list provided by the City, the Developer must <br />complete all items on the punch list and then notify the City to re-inspect the Improvements. The <br />Developer shall install the final bituminous wear course after the first bituminous course has