My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#22 - Hudson Blvd Segment A Improvements
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
05-07-24
>
#22 - Hudson Blvd Segment A Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2025 1:40:10 PM
Creation date
8/16/2024 2:21:01 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br />M <br />M <br />M <br />MB <br />M <br />MB <br />135 <br />140 <br />MH <br />MH <br />MH <br />MH <br />6' SHLD <br />12' THRU <br />6' SHLD <br />12' THRU <br />13' TWLTL <br />13' TWLTL <br />12' THRU <br />8' TRAIL12' THRU <br />8' TRAIL <br />J <br />A <br />D <br />E <br /> <br />T <br />R <br />A <br />I <br />L <br />(HUDSON) <br />{ HUDSON BLVD <br />B624 C&G <br />B624 C&G <br />B624 C&G <br />TO CITY OWNED POND <br />PROPOSED POND MODIFICATIONS <br />I-94 WB <br />M <br />A <br />T <br />C <br />H <br />L <br />I <br />N <br />E <br /> <br />- <br /> <br />S <br />T <br />A <br />. <br /> <br />1 <br />4 <br />1 <br />+ <br />3 <br />0 <br />. <br />0 <br />0 <br /> <br />( <br />H <br />U <br />D <br />S <br />O <br />N <br />) <br />MA <br />T <br />C <br />H <br />L <br />I <br />N <br />E <br /> <br />- <br /> <br />S <br />T <br />A <br />. <br /> <br />1 <br />3 <br />4 <br />+ <br />3 <br />0 <br />. <br />0 <br />0 <br /> <br />( <br />H <br />U <br />D <br />S <br />O <br />N <br />) <br />4 <br />/ <br />2 <br />9 <br />/ <br />2 <br />0 <br />2 <br />4 <br />6 <br />: <br />4 <br />8 <br />: <br />2 <br />1 <br /> <br />P <br />M <br />k <br />e <br />v <br />i <br />n <br />c <br />o <br />u <br />r <br />t <br />n <br />e <br />y <br />CITY OF LAKE ELMO <br />8 <br />OF <br />6 <br />SHEET <br />PROPOSED 2024 IMPROVEMENTS <br />HUDSON BOULEVARD <br />50 <br />SCALE IN FEET <br />PROPSOED DRAINAGE <br />DRAINAGE & UTILITY EASEMENT <br />CONSTRUCTION LIMITS <br />TEMPORARY EASEMENT <br />EXISTING R/W <br />PROPSOED DITCH <br />TURF ESTABLISHMENT <br />DRIVEWAY, & MEDIAN <br />PROPOSED CONCRETE WALK, <br />8" AGGREGATE BASE CLASS 6 <br />2.25" BITUMINOUS PAVEMENT <br />PROPOSED TRAIL <br />12" SELECT GRANULAR EMBANKMENT <br />8" AGGREGATE BASE CLASS 6 <br />4" BITUMINOUS PAVEMENT <br />PROPOSED ROADWAY EXPANSION <br />8" RECLAIMED AGGREGATE <br />4" BITUMINOUS PAVEMENT <br />PROPOSED FULL-DEPTH RECLAMATION PROPSOED CURB & GUTTER <br />LEGEND
The URL can be used to link to this page
Your browser does not support the video tag.