Laserfiche WebLink
Lake Elmo Townhome Elevations December 13, 2023 Wildflower Drive and 39th Street , Lake Elmo, Minnesota 10A <br />A <br />05 <br />Rear Perspective <br />scale: 1/8”=1' <br />A <br />03 <br />Front Elevation <br />scale: 1/8”=1' <br />A <br />02 <br />Upper Floor Plan <br />scale: 1/8”=1' <br />A <br />01 <br />Main floor Plan <br />scale: 1/8”=1' <br />Alternate Color Combinations <br />Cultured Stone Veneer <br />Black or Dark Grey Asphalt shingles <br />8:12 Roof Pitch <br />4:12 Roof Pitch <br />6” Window, door, Freeze Board, and Accent Trims <br />Color to be Snowcap White <br />16” x 12” White PVC Decorative Bracket <br />LP Smart Lap Siding 4” Reveal <br />Color to be Snowcap White <br />LP Smart Siding 4” Reveal <br />Color to be Snowcap White <br />LP Smart Lap Siding 10” Reveal <br />Color to be Quarry Gray <br />8:12 Roof Pitch <br />3:12 Roof Pitch <br />A <br />04 <br />Side Elevation <br />scale: 1/8”=1' <br />Shown in Snowcap White <br />Cultured Stone Veneer <br />6” x 6” Post <br />6” Window, door, Freeze Board, and Accent Trims <br />Color to be Snowcap White <br />16” x 12” White PVC Decorative Bracket <br />33 <br />' <br />- <br />4 <br />" <br />1'-0" <br />Garage Door TBD <br />2’-0” <br />1’-0” <br />1'-0" <br />SQFT 460 SQFT 440 <br />GarageGarage <br />6068 <br />50 <br />5 <br />0 <br />6068 <br />3068 <br />3068 3068 3068 3068 <br />16 x 7 Over Head Door <br />16 x 7 Over Head Door <br />50 <br />5 <br />0 <br />3068 <br />Open <br />Below <br />Open <br />Below <br />3640 3640 <br />20 <br />4 <br />6 <br />36 <br />4 <br />8 <br />2046 2046 2046 <br />36 <br />4 <br />8 <br />39 <br />' <br />- <br />0 <br />" <br />52'-0" <br />Utility RoomUtility Room <br />Central A/C <br />Gas/Elec. Meters <br />Gas/Elec. Meters <br />Central A/C <br />A <br />06 <br />Notes <br />CENTRAL A/C EQUIPMENT ARE ON THE BACK OF EACH UNIT <br />USING OUR LOT LINE LANDSCAPE PLANTINGS AS A NATURAL SCREEN <br />WE HAVE DONE OUR BEST TO ANTICIPATE WHERE XCEL ENERGY WILL <br />PLACE THE GAS AND ELECTRIC METERS. PLEASE REFER TO FLOOR PLANS <br />AND ELEVATION DRAWINGS <br />OUR INTENTION IS FOR HVAC VENTING TO EXIT OUT ROOF WHENEVER <br />POSSIBLE <br />WE ARE NOT PLANNING ON USING <br />UTILITY VAULTS <br />PLEASE REFER TO THE ENGINEERING UTILITY PLANS FOR INFORMATION <br />REGARDING CONDUITS AND ESTIMATED LOCATIONS <br />ALL OTHER HVAC EQUIPMENT WILL BE INSTALLED INSIDE EACH <br />UNIT WITH ACCESS FROM GARAGE. REFER TO FLOOR PLANS <br />WE WILL NOT HAVE CENTRAL TRASH AREAS EACH UNIT HAS <br />INDIVIDUAL TRASH BINS MEANT TO BE STORED <br />IN EACH OF THE GARAGES. <br />EXTERIOR LIGHTING WILL BE SHIELDED FROM PRODUCING OUTWARD LIGHT <br />36 <br />4 <br />8 <br />36 <br />4 <br />8 <br />20 <br />4 <br />6 <br />14'-0"24'-0"14'-0" <br />52'-0" <br />51 <br />' <br />- <br />0 <br />" <br />18 <br />' <br />- <br />0 <br />" <br />70 <br />' <br />- <br />0 <br />" <br />6'-0"