My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#19 - At Home Apartments Final Plat and PUD
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
05-21-24
>
#19 - At Home Apartments Final Plat and PUD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2025 2:04:35 PM
Creation date
8/16/2024 2:23:11 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Ed Marchan ● Don Pereira ● John Brach ● Rick Gelbmann ● William Armstrong <br />P.O. Box 838 | Lake Elmo, MN 55042-0538 | www.vbwd.org <br /> <br /> <br /> <br /> <br /> <br /> <br />December 19, 2023 <br /> <br /> <br /> <br />Leanna Stefaniak <br />At Home Apartments, LLC <br />1289 Grand Ave <br />St. Paul, MN 55105 <br /> <br />Re: Lake Elmo Townhomes 8—Lake Elmo, Minnesota <br /> VBWD Permit #2023-31 <br /> <br />Dear Ms. Stefaniak: <br /> <br />Enclosed is the Valley Branch Watershed District (VBWD) permit for your project. Please note the <br />following conditions imposed by the Managers, which are also listed on the back of the permit. <br />1. The applicant shall obtain approval from the City of Lake Elmo Engineer for the proposed <br />increase in peak stormwater runoff rates to the storm sewer in 39th St. N. east of Wildflower <br />Drive. <br />2. Updated plans shall be submitted to the VBWD Engineer for approval with a note or detail to <br />state that if soils that are not conducive to infiltration are discovered within the infiltration <br />basin during construction, these soils need to be removed and replaced with soil material that <br />will infiltrate at the design rate. The permit is not valid until the VBWD Engineer has approved <br />the submittal. <br />3. This permit is not valid until a maintenance agreement in the general format of Appendix A of <br />the VBWD Rules is submitted to and approved by the VBWD Attorney. The maintenance <br />agreement must include a monitoring plan and details on maintaining the stormwater <br />management facility. <br />4. Prior to permit closeout, a plan for post-project management of chloride use shall be <br />submitted. At a minimum, the plan shall include the following: <br />a. Designation of an individual authorized to implement the chloride-use plan <br />b. Designation of an MPCA-certified salt applicator to implement the chloride-use plan for <br />the site <br />5. Updated plans shall be submitted to the VBWD Engineer for approval to revise the discharge <br />elevation of FES-300 to be at the bottom of the infiltration basin rather than up the slope to <br />mitigate potential erosion issues. The permit is not valid until the VBWD Engineer has <br />approved the submittal.
The URL can be used to link to this page
Your browser does not support the video tag.