Laserfiche WebLink
<br />Leanna Stefaniak <br />VBWD Permit #2023-31: Lake Elmo Townhomes 8 <br />December 19, 2023 <br />Page 3 <br /> <br /> <br /> <br />17. Valley Branch Watershed District shall be granted drainage easements that cover land <br />adjacent to stormwater management facilities, wetlands, lakes, and lowlands up to their <br />100-year flood elevations and all ditches, storm sewers, and maintenance access to the <br />stormwater management facilities. <br />18. The required drainage and access easements shall be recorded with the Washington County <br />Recorder’s Office. <br />19. Return or allowed expiration of any remaining surety and permit closeout is dependent on the <br />permit holder providing proof that all required documents have been recorded (including but <br />not limited to easements) and providing as-built drawings that show that the project was <br />constructed as approved by the Managers and in conformance with the VBWD Rules and <br />Regulations. <br />20. This permit becomes invalid if (1) the work is not initiated within 1 year of permit issuance, <br />(2) work is idle for 12 consecutive months, or (3) work is not completed within 3 years of the <br />permit issuance date. <br />Thank you for your cooperation with the District’s permit program. <br />Sincerely, <br /> Ed Marchan, President <br />Valley Branch Watershed District <br /> <br />EM/ymh <br />Enclosure <br />c: Susannah Torseth, VBWD Attorney <br />Dan Scollan, East Metro Area Hydrologist—MDNR <br />Jeffrey Brower, VBWD District Inspector <br />John Blenker, Westwood Professional Services—Authorized Agent <br />Jack Griffin, Focus Engineering, City Engineer—City of Lake Elmo <br />Clark Schroeder, Interim City Administrator—City of Lake Elmo <br />Sophia Jensen, City Planner—City of Lake Elmo <br />John Taylor, Building Official—City of Lake Elmo <br />John Hanson, Barr Engineering Co. <br />Josh Phillips, Barr Engineering Co. <br />Karen Wold, Barr Engineering Co. <br />Mike Strong, Barr Engineering Co. <br />Eddie Anderson, Barr Engineering Co. <br />Yvonne Huffman, Barr Engineering Co. <br /> <br />\\barr.com\projects\Mpls\23 MN\82\2382020\_MovedFromMpls_P\2023\Permit 2023-31 Lake Elmo Townhomes 8\2023- <br />31_Permit Ltr_Lake Elmo Townhouse 8.docx <br /> <br />