My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#20 - Bridgewater Village Final Plat
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
05-21-24
>
#20 - Bridgewater Village Final Plat
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2025 2:08:15 PM
Creation date
8/16/2024 2:23:19 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOW, THEREFORE, BE IT RESOLVED THAT the City Council does hereby approve <br />Bridgewater Village Final Plat subject to the following conditions: <br /> <br />1. Prior to the City signing or approving recording of the Final Plat or Development Agreement, <br />the Applicant shall fully address all comments in the following review memos, or any <br />subsequently revised memo, to the satisfaction of the City: <br />a. City Engineer’s memos dated April 15, 2024, <br />b. City Landscape Architect’s memo dated April 11, 2024, <br />c. City Fire Chief’s memo dated March 27, 2024. <br />d. City Attorney’s Plat Opinion dated April 12, 2024. <br />2. All public improvements constructed to support the subdivision must be designed and <br />constructed in accordance with the City Engineering Design Standards Manual dated January <br />2022, unless approved otherwise by the City. <br />3. All easements as requested by the City Engineer and Public Works Department shall be <br />documented on the Final Plat before the execution of the final plat by City Officials. <br />4. That prior to the City permitting the recording of the Final Plat and Development Agreement, the <br />applicant shall demonstrate that the plans reflect compliance with Valley Branch Watershed <br />District (VBWD) review requirements and provide the City evidence that all conditions attached <br />to a VBWD permit will be met before the starting any grading activity on the site. <br />5. That the applicant shall obtain all necessary permits for the Subdivision Improvements <br />including but not limited to all applicable City permits (building, grading, sign, etc.), MDH, <br />MPCA, County R/W, NPDES/SWPPP permits and Valley Branch Watershed District approval <br />before starting any grading or construction activities. <br />6. Sign permits are required and proposed signage must comply with Lake Elmo City Code. <br />7. The applicant/developer is responsible, at their own expense, for installing all required right of <br />way improvements. <br />8. No flexibility from City standards is provided by this approval. All lots to be platted in this <br />subdivision must meet existing City standards at the time of building permit submittal. <br />9. Stormwater facilities will remain privately owned and maintained. A storm water maintenance <br />and easement agreement in City’s standard form of agreement shall be executed and recorded <br />with the final plat. <br />10. The watershed district approved stormwater permit requires the implementation of stormwater <br />reuse. A Stormwater Maintenance and License Agreement in the City’s standard form of <br />agreement shall be executed and recorded with the final plat. <br />11. If applicable, a landscape and irrigation license agreement in a form acceptable to the City shall <br />be executed and recorded with the final plat. <br />12. The applicant/developer shall provide the City a fee in lieu of park land dedication as required by <br />Section 103.00.150 and consistent with preliminary approvals to be paid prior to recording of the <br />final plat. <br />13. The applicant shall pay required Village AUAR fee prior to release of the final plat. <br />14. Final Plat approval must be contingent upon the applicant completing off‐site turn lane <br />improvements along Stillwater Lane for both new access locations to the subdivision. Improvements <br />are be completed meeting City design standards and Municipal State Aid Design Standards. <br />15. Final Plat approval must be contingent upon the applicant completing bituminous off‐site trail <br />connections as identified as part of the Preliminary Plat approval. <br />16. All off‐site permanent and temporary easements, if necessary to construct the proposed <br />subdivision improvements, must be acquired and provided to the city prior to the approval of the
The URL can be used to link to this page
Your browser does not support the video tag.