My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#20 - Bridgewater Village Final Plat
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
05-21-24
>
#20 - Bridgewater Village Final Plat
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2025 2:08:15 PM
Creation date
8/16/2024 2:23:19 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
management system meets City and Watershed rules for site discharge rate, high water levels, <br />and water quality treatment. <br /> <br />Utilities <br />The proposed development will be served by trunk sanitary sewer, storm sewer, and watermain <br />utilities for the entire site. The proposed public sanitary mai n will be an extension of the existing <br />8” PVC stub along C.S.A.H. 14 from the south. This main will be extended north into the site per <br />City requirements with branches to service both commercial and residential sections. The sewer <br />extension will require an MCES sanitary sewer extension permit. Sanitary service stubs will be <br />provided for each lot for future building connection. Services will be private and dedicated to <br />each use. <br />The proposed public watermain will be a 12” DIP main extended south from Stillwater Way N. <br />The existing watermain is at Little Bluestem Trail N and Stillwater Way N. It is anticipated that <br />some offsite work will be required to bring watermain to the subject parcel. The proposed main <br />will run to the southern side of the site with 8” loops broken off to service the commercial and <br />residential areas as necessary. Hydrants will be provided as necessary for adequate fire <br />suppression coverage for the development. Water service stubs will be provided for each lot for <br />future building connection. Services will be private and dedicated to each use. <br />The proposed storm sewer will collect stormwater runoff from each impervious area and convey <br />drainage to the proposed stormwater management systems as previously discussed. <br /> <br />Landscaping <br />The proposed site landscaping includes boulevard trees and sod per the City of Lake Elmo <br />engineering design standards. Future landscaping for the addition of commercial buildings and <br />VMDR area will be designed in accordance with City of Lake Elmo standards. <br />
The URL can be used to link to this page
Your browser does not support the video tag.