My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#11 - Newsletter
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
06-18-24
>
#11 - Newsletter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2025 2:44:53 PM
Creation date
8/16/2024 2:26:06 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Summer 2024 <br /> <br /> <br /> <br />Thank you to our 2024 Lions Park Sign Sponsors <br />The vintage style signs posted on the outfield fencing at Lions Park help support projects at Lions Park <br />such as backstop improvements and a 45th parallel marker. This year we have 19 new and renewing <br />sponsors: <br /> <br />Aaron Runk – State Farm Insurance Krueger Tree Farm <br />Apex Construction, Inc. Lake Elmo Bank <br />Bolton & Menk Lake Elmo Baseball <br />Capra’s Utilities, Inc. Lake Elmo Rotary Club <br />Carvelli Plumbing ShaneCon, Inc. <br />Dan Stoudt - State Farm Insurance Stoudt Law, Ltd. <br />Hagberg’s Country Market Tiffhanie Zheng – Guardians Real Estate Group <br />Krinkie Heating & Air Conditioning Zignego Agency <br /> <br /> <br /> <br /> <br />City Drinking Water Supply Well #2 <br /> <br />PFAS test results from the Minnesota Department of Health continue to show <br />PFAS slowly increasing in Lake Elmo wells. Well number 2 PFAS test results <br />exceed the new EPA guidelines of 4 parts per trillion that will become an <br />enforceable standard in 2027. To address this issue, the use of Well 2 has <br />been throttled back and has only been used on a limited, emergency basis. In <br />2023, Well 2 was only used during the 2023 irrigation season, averaging a run <br />time of less than 2.5 hours per day on less than ten days across the irrigation <br />season. <br /> <br />With Well 2 impacted by PFAS, the City is working with the MDH and MPCA <br />to install an Anion Exchange Resin (IX) treatment filter system at Well 2 with <br />the treatment system to be online prior to the 2025 irrigation season. Once <br />installed, the City will be able to resume full production use of the well <br />following the removal of the PFAS.
The URL can be used to link to this page
Your browser does not support the video tag.