My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-067
LakeElmo
>
City Council
>
Resolutions (1970's to 2020)
>
2020's
>
2024
>
2024-067
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2025 2:33:23 PM
Creation date
8/23/2024 10:36:31 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NOW, THEREFORE, BE IT RESOLVED THAT the City Council does hereby approve <br />Bridgewater Village Final Plat subject to the following conditions: <br />1. Prior to the City signing or approving recording of the Final Plat or Development Agreement, <br />the Applicant shall fully address all comments in the following review memos, or any <br />subsequently revised memo, to the satisfaction of the City: <br />a. City Engineer's memos dated April 15, 2024, <br />b. City Landscape Architect's memo dated April 11, 2024, <br />c. City Fire Chief s memo dated March 27, 2024. <br />d. City Attorney's Plat Opinion dated April 12, 2024. <br />2. All public improvements constructed to support the subdivision must be designed and <br />constructed in accordance with the City Engineering Design Standards Manual dated January <br />2022, unless approved otherwise by the City. <br />3. All easements as requested by the City Engineer and Public Works Department shall be <br />documented on the Final Plat before the execution of the final plat by City Officials. <br />4. That prior to the City permitting the recording of the Final Plat and Development Agreement, the <br />applicant shall demonstrate that the plans reflect compliance with Valley Branch Watershed <br />District (VBWD) review requirements and provide the City evidence that all conditions attached <br />to a VBWD permit will be met before the starting any grading activity on the site. <br />5. That the applicant shall obtain all necessary permits for the Subdivision Improvements <br />including but not limited to all applicable City permits (building, grading, sign, etc.), MDH, <br />MPCA, County R/W, NPDES/SWPPP permits and Valley Branch Watershed District approval <br />before starting any grading or construction activities. <br />6. Sign permits are required and proposed signage must comply with Lake Elmo City Code. <br />7. The applicant/developer is responsible, at their own expense, for installing all required right of <br />way improvements. <br />8. No flexibility from City standards is provided by this approval. All lots to be platted in this <br />subdivision must meet existing City standards at the time of building permit submittal. <br />9. Stormwater facilities will remain privately owned and maintained. A storm water maintenance <br />and easement agreement in City's standard form of agreement shall be executed and recorded <br />with the final plat. <br />10. The watershed district approved stormwater permit requires the implementation of stormwater <br />reuse. A Stormwater Maintenance and License Agreement in the City's standard form of <br />agreement shall be executed and recorded with the final plat. <br />11. If applicable, a landscape and irrigation license agreement in a form acceptable to the City shall <br />be executed and recorded with the final plat. <br />12. The applicant/developer shall provide the City a fee in lieu of park land dedication as required by <br />Section 103.00.150 and consistent with preliminary approvals to be paid prior to recording of the <br />final plat. <br />13. The applicant shall pay required Village AUAR fee prior to release of the final plat. <br />14. Final Plat approval must be contingent upon the applicant completing off site turn lane <br />improvements along Stillwater Lane for both new access locations to the subdivision. Improvements <br />are be completed meeting City design standards and Municipal State Aid Design Standards. <br />15. Final Plat approval must be contingent upon the applicant completing bituminous off -site trail <br />connections as identified as part of the Preliminary Plat approval. <br />16. All off -site permanent and temporary easements, if necessary to construct the proposed <br />subdivision improvements, must be acquired and provided to the city prior to the approval of the <br />
The URL can be used to link to this page
Your browser does not support the video tag.