My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-078
LakeElmo
>
City Council
>
Resolutions (1970's to 2020)
>
2020's
>
2024
>
2024-078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2025 2:33:23 PM
Creation date
8/23/2024 10:36:39 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF LADE ELMO <br />WASHINGTON COUNTY <br />STATE OF MINNESOTA <br />A RESOLUTION ORDERING THE IMPROVEMENT, ACCEPTING BIDS AND <br />AWARDING A CONTRACT FOR THE FOR THE <br />HUDSON BOULEVARD IMPROVEMENTS — SEGMENT A <br />WHEREAS, pursuant to City Council resolution, adopted on December 5, 2023, a feasibility <br />report has been prepared by FOCUS Engineering, Inc. for the Hudson Boulevard Improvements Segment <br />A, from Inwood Avenue (CSAH 13) to 1,400 feet east of Jade Trail; and <br />WHEREAS, ten days mailed notice and two weeks published notice of the hearing was given, <br />and the hearing was held thereon on the 18th day of June 2024, at which all persons desiring to be heard <br />were given the opportunity to be heard thereon; and <br />WHEREAS, the feasibility report prepared by FOCUS Engineering, Inc., and dated May 2024 <br />states that the project is necessary, cost-effective, and feasible; and <br />WHEREAS, pursuant to an advertisement for bids for the Hudson Boulevard Improvements <br />Segment A, from Inwood Avenue (CSAH 13) to 1,400 feet east of Jade Trail, bids were received, opened, <br />and tabulated according to law, and bids were received complying with the advertisement; and <br />WHEREAS, bids were tabulated, checked and summarized to verify that all requirements of the <br />submittal were met; and <br />WHEREAS, the project engineer reviewed the bids and has provided a letter recommending the <br />award of the contract to the lowest responsible bidder, Dresel Contracting, Inc., for the bid amount of <br />$2,075,003.37. <br />NOW, THEREFORE, BE IT RESOLVED, <br />1. Such improvement is deemed necessary, cost-effective, and feasible as detailed in the Feasibility <br />Report dated May 2024. <br />2. Such improvement is hereby ordered as proposed in the council resolution adopted this 18th day <br />of June, 2024. <br />3. The city council declares its official intent to reimburse itself for the costs of the improvement <br />from the proceeds of tax-exempt bonds. <br />4. That the Mayor and City Clerk are hereby authorized and directed to enter into a Contract in <br />accordance with the above ordered Project, in the amount of the Contractor's lowest responsible <br />bid, and according to the plans and specifications thereof approved by the City Council. <br />5. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits <br />made with their bids, except that the deposits of the successful bidder and the next two lowest <br />bidders shall be retained until a contract has been signed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.