My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#07 - Prairie Sky Townhomes DA
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
08-20-24
>
#07 - Prairie Sky Townhomes DA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2025 4:36:09 PM
Creation date
10/18/2024 2:05:37 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />7 <br />LA515\129\891453.v6 <br />streets become impassable, such streets shall be barricaded and closed by the Developer. The <br />Developer and its contractors must keep 39th Street North open to traffic at all times unless a <br />right-of-way obstruction permit is obtained from the City. The Developer shall be responsible for <br />keeping streets within and outside of the Subdivision clean and clear of dirt and debris that may <br />spill, track, or wash onto the street from the Developer’s operations. The Developer shall contract <br />for street cleaning for streets within and immediately adjacent to the Subdivision until the <br />Subdivision Improvements have been accepted by the City. At a minimum, scraping and <br />sweeping shall take place on a weekly basis and on a daily basis during heavy tracking days. <br />11. LICENSE. The Developer hereby grants the City, its agents, employees, officials, and <br />contractors a license to enter the Subdivision to perform all work and inspections deemed <br />appropriate by the City in conjunction with the development of the Subdivision and this <br />Agreement. <br />12. CONSTRUCTION ACCESS AND PARKING. Construction traffic access and egress <br />for all work on the site is restricted to access via 39th Street North at the existing and approved <br />new driveway location and rock construction entrance per the approved erosion control plans. No <br />construction traffic is permitted on other adjacent streets or at any other location along 39th Street <br />North. The Developer must maintain adequate access for emergency vehicles that is acceptable <br />to the City in its sole discretion at all times during construction. <br /> All construction parking and staging, including the loading and unloading of equipment <br />and supplies during the construction of the Subdivision Improvements must be completed interior <br />to the project site and is not allowed to occur on a public street or within any public right-of-way, <br />including, but not limited to 39th Street North. The Developer and contractors shall be responsible <br />for the repair and restoration of any damage to the street, curb, trail, sidewalk, and boulevard <br />caused by the construction activities. Such work shall meet all City standards and specifications. <br />13. CONSTRUCTION SEQUENCE AND COMPLIANCE. The City will require the
The URL can be used to link to this page
Your browser does not support the video tag.