My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#07 - Prairie Sky Townhomes DA
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
08-20-24
>
#07 - Prairie Sky Townhomes DA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2025 4:36:09 PM
Creation date
10/18/2024 2:05:37 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />13 <br />LA515\129\891453.v6 <br />In addition, a sewer connection charge in the amount of $1,000.00 per REC, a <br />Metropolitan Council sewer availability charge in the amount of $2,485.00 per REC, and a water <br />connection charge in the amount of $1,000.00 per REC will be payable by the Developer and <br />collected by the City at the time the City issues a building permit for each building with the <br />development. <br />23. WETLAND MITIGATION. There have been no wetlands found on the Property, <br />however, in the event that there are determined to be wetlands on the Property during the course <br />of construction, the Developer shall complete wetland mitigation/restoration in accordance in <br />accordance with any applicable watershed or agency permits and any plans approved by the <br />watershed or the City. If the mitigation work is found to be incomplete or restoration is <br />unsuccessful, the City draw down the Security at any time during the warranty period to perform <br />the work if the Developer fails to take corrective measures after being provided reasonable notice <br />by the City. <br />24. BUILDING PERMITS/CERTIFICATES OF OCCUPANCY. <br />A. No building permits shall be issued for any lot within the Subdivision until such time <br />that sanitary sewer and watermain are installed, tested and accepted by the City <br />Engineer; storm sewer, curbing and one lift of asphalt has been installed and <br />tested for all public streets within the subdivision; boulevard grading has been <br />completed within the entire right-of-way, sidewalks have been installed; street and <br />traffic control signs are installed; property monuments have been installed; and <br />grading as-built plans have been submitted and approved by the City. The <br />Developer shall install silt fence at the back of sidewalk along the entire street <br />frontage with the exception of a rock construction entrance for each building, to <br />protect the sidewalks and boulevard from impacts during building construction. <br />B. Breach of the terms of this Agreement by the Developer including nonpayment of
The URL can be used to link to this page
Your browser does not support the video tag.