Laserfiche WebLink
1 <br />Memorandum <br />TO: Sophia Jensen <br />FROM: Tim Solomonson, PLA <br />DATE: 09/9/24 <br />RE: Initial Landscape Warranty Re-inspection Acceptance| Ebertz Property (Tesla <br />Dealership) <br /> <br /> Initial <br />Inspection <br />Initial <br />Re- <br />inspection <br /> <br />Re- <br />inspection <br />1-Year <br />Inspection <br />1-Year <br />Re- <br />inspection <br />2-Year <br />Inspection <br />2-Year <br />Re- <br />inspection <br />Final <br />Inspection <br />Acceptance <br />Ebertz Propery (Tesla Dealership) <br />06/27/24 08/01/24 08/09/24 <br />08/15/24 <br /> <br />EBERTZ PROPERTY (TESLA DEALERSHIP) – 0 YEAR LANDSCAPE WARRANTY RE-INSPECTION ACCEPTANCE <br />Inspector: <br />• Tim Solomonson, PLA <br />• Patrick O’Keeffe, PLA <br />• Leilen Farias, Landscape Designer <br /> <br />Inspection Summary: <br />• The trees identified for replacement and corrective action on August 9th, 2024 have been replaced and <br />adjusted as required. <br />• Previously bare soil areas in Lots 2 and 3 have been hydroseeded and seed blankets have been <br />installed to help establishment. <br />• Trees identified in the approved tree preservation plan have been preserved. <br /> <br />Recommendations: <br />• The development tree preservation has met the City’s requirements for initial acceptance. <br />• The development landscaping has met the City’s requirements for initial acceptance. <br /> <br />Tim Solomonson, PLA (MN) <br />Landscape Architect <br />P: (612) 802-0142 | E: Tim@hkgi.com <br />800 WASHINGTON AVE N STE 103 MPLS, MN 55401 | HKGI.COM <br /> <br />