Laserfiche WebLink
Estimated Total Qty. Amount Earned <br />Job Number Item # Description Quantity Price To Date To Date <br />2412980 1 MOBILIZATION 1.00 $22,000.00 1.00 $22,000.00 <br />2412980 2 REMOVE SIGN 1.00 $42.00 1.00 $42.00 <br />2412980 3 SALVAGE DELINEATOR/MARKER 1.00 $26.00 1.00 $26.00 <br />2412980 4 SALVAGE SIGN 5.00 $210.00 5.00 $210.00 <br />2412980 5 SAWING BIT 172.00 $473.00 172.00 $473.00 <br />2412980 6 REMOVE BIT PAVEMENT 18.00 $396.00 18.00 $396.00 <br />2412980 7 SUBGRADE CORRECTION 2,140.00 $13,375.00 0.00 $0.00 <br />2412980 8 SUBGRADE PREP 10,701.00 $21,402.00 10,701.00 $21,402.00 <br />2412980 9 AGG SURFACING FROM <br />STOCKPILEHAUL FROM KEATS <br />146.00 $6,278.00 146.00 $6,278.00 <br />2412980 10 STREET SWEEPER 20.00 $2,000.00 9.00 $900.00 <br />2412980 11 WATER 59.00 $3,245.00 6.00 $330.00 <br />2412980 12 FULL DEPTH RECLIMATION 11,658.00 $34,974.00 11,658.00 $34,974.00 <br />2412980 13 HAUL FULL DEPTH RECLIMATION 1,295.00 $22,015.00 1,295.00 $22,015.00 <br />2412980 14 MILL BIT SURFACE 2" 29.00 $203.00 0.00 $0.00 <br />2412980 15 TACK 749.00 $749.00 600.00 $600.00 <br />2412980 16 SPWEA240C 1,294.00 $109,990.00 1,244.44 $105,777.40 <br />2412980 17 SPNWB230C 1,294.00 $109,990.00 1,251.19 $106,351.15 <br />2412980 18 TRAFFIC CONTROL 1.00 $8,500.00 1.00 $8,500.00 <br />2412980 19 INSTALL SIGN 5.00 $3,500.00 5.00 $3,500.00 <br />2412980 20 INSTALL DELINEATOR/MARKER 1.00 $26.00 1.00 $26.00 <br />2412980 21 SIGN 15.00 $975.00 15.00 $975.00 <br />2412980 22 STORM DRAIN INLET PROTECTION 2.00 $200.00 2.00 $200.00 <br />2412980 23 CULVERT END CONTROLS 8.00 $1,240.00 8.00 $1,240.00 <br />2412980 24 SEDIMENT CONTROL LOG 728.00 $2,002.00 728.00 $2,002.00 <br />2412980 25 FERTILIZER 73.00 $408.80 0.00 $0.00 <br />2412980 26 21-111 37.00 $1,147.00 0.00 $0.00 <br />2412980 27 RAPID STABIL 4.00 $4,000.00 0.00 $0.00 <br />2412980 28 6" SOLID LINE GR IN 5,136.00 $7,447.20 5,168.00 $7,493.6028 LF $1.45 <br />27 MGAL $1,000.00 <br />26 LB $31.00 <br />25 LB $5.60 <br />24 LF $2.75 <br />23 EACH $155.00 <br />22 EACH $100.00 <br />21 SF $65.00 <br />20 EACH $26.00 <br />19 EACH $700.00 <br />18 LS $8,500.00 <br />17 TON $85.00 <br />16 TON $85.00 <br />15 GAL $1.00 <br />14 SY $7.00 <br />13 CY $17.00 <br />12 SY $3.00 <br />11 MGAL $55.00 <br />10 HR $100.00 <br />9 CY $43.00 <br />8 SY $2.00 <br />7 SY $6.25 <br />6 SY $22.00 <br />5 LF $2.75 <br />4 EACH $42.00 <br />3 EACH $26.00 <br />2 EACH $42.00 <br />1 LS $22,000.00 <br />Item ID UM Price <br />Unit <br />Job Title: CITY OF LAKE ELMO- 15TH STREET Project Manager: PAUL HILDESTAD <br />Job Item Progress Summary <br />Job Number: 2412980 Project Name: 15TH STREET <br /> 9/4/2024 10:44 AM Produced by B2W Software, Inc. Page 1 of 1