Laserfiche WebLink
Client:City of Lake Elmo <br />Project:2025 Street and Utility Improvements <br />TASK <br />NO.WORK TASK DESCRIPTION Project ManagerMike WarnerProject EngineerColeton NelsonEngineering TechnicianStormwater ManagerBrent JohnsonStormwater EngineerBrian RuckerSurvey ManagerRon AlwinGraduate SurveyorJeff CornellSurvey Field TechnicianSurvey Crew(2-person)ClericalCourtney MaulTotals <br />1.0 Preliminary Design <br />1.1 Project Management 10 2 12 <br />1.2 Develop Critical Success Criteria 1 1 2 <br />1.3 Review Existing As-Built Plans 1 4 5 <br />1.4 Site Visit to Review Existing Conditions 4 4 8 <br />1.5 Topographic Survey of Existing Conditions 1 4 10 10 70 16 4 115 <br />1.6 Review Condition of Existing Storm Sewer System 1 12 10 23 <br />1.7 Recommendation of Storm Sewer Repairs and Modifications 1 4 4 16 25 <br />1.8 Review Geotechnical Report 2 4 6 <br />1.9 Preliminary Design and Stormwater Management Plan 8 24 2 4 38 <br />1.10 Review Existing R/W and Easements and Identify Needs 1 4 2 7 <br />1.11 Identify Major Private Utility Conflicts 1 2 3 <br />1.12 Identify Applicable Permits 1 2 1 2 6 <br />1.13 Prepare Preliminary Design Memo 4 20 4 28 <br />1.14 Prepare Preliminary Opinion of Probable Costs 2 12 14 <br />1.15 Prepare Feasibility Report Exhibit(s)2 16 18 <br />TOTAL HOURS - TASK 1 40 115 10 7 26 12 10 70 16 4 310 <br />BOLTON & MENK, INC. <br />2025 Street and Utility Improvements <br />City of Lake Elmo, Minnesota