Laserfiche WebLink
MEMORANDUM <br />Page 2 of 4 <br />A forced main routed from that lift station to the west will connect to another forced main below <br />Lake Elmo Avenue North, which connects to the proposed new Lake Elmo Elementary School. Also <br />included in this submittal is the completed traffic study, which reviewed existing vehicular and <br />pedestrian traffic on and around the site; and a conceptual diagram showing a potential access road <br />to a possible future residential development to the south of Oak-Land Middle School. <br /> <br />Anticipated mobilization, ground-breaking and building shell construction of the additions is <br />planned to occur in Spring 2025. Construction of the two classrooms additions is expected to be <br />completed by August 2025, with the gymnasium addition concluding in the winter of 2025-2026. <br /> <br />Item A. A listing of contact information including name(s), address(es), and phone number(s) of <br />the: owner of record, authorized agents or representatives, engineer, surveyor, and any other <br />relevant associates. <br /> <br />Response: <br />Independent School District #834 Staff: <br />Maria Schrul, Executive Director of Finance <br />1875 South Greeley Street, Stillwater, Minnesota 55082 <br />651-351-8321 <br /> <br />Mark Drommerhausen, Executive Director of Operations <br />1875 South Greeley Street, Stillwater, Minnesota 55082 <br />651-351-8379 <br /> <br />Anthony Willger, Manager of Facilities and Site Operations <br />1875 South Greeley Street, Stillwater, Minnesota 55082 <br />651-351-8374 <br /> <br /> Design and Construction <br />Paul Aplikowski, Wold Architects and Engineers <br />332 Minnesota Street, Saint Paul, Minnesota 55101 <br />651-227-7773 <br /> <br />Valerie Peterson, Wold Architects and Engineers <br />332 Minnesota Street, Saint Paul, Minnesota 55101 <br />651-227-7773 <br /> <br />Greg Buchal, Larson Engineering (Civil Engineer) <br />3524 Labore Road, White Bear Lake, Minnesota 55110 <br />651-481-9120 <br />