|
17"9"12"9"10"6"10"EXISTING BUILDINGMANNING AVENUE NORTH 10TH STREET NORTH (AKA C.S.A.H. 10)(AKA C.S.A.H. 15)18"SP7"6"6"6"6"6"6"12"ELEC MHRIM=905.0ELEC MH
<br />RIM=907.9
<br />ELEC MHRIM=907.9ELEC MH
<br />RIM=907.9
<br />ELEC MH
<br />RIM=906.6
<br />ELEC MH
<br />RIM=906.3ELEC MH
<br />RIM=905.6
<br />SHED
<br />SHED
<br />915916917 917916917918917916915914913912911910909908916915914913912915914913913914912912913914914913912911911910910
<br />908905 912913913913907 908909910911912913909910911912913914915915914913912912913 915914916914913912
<br />911
<br />911910
<br />910
<br />911
<br />909
<br />909 910911912908
<br />908
<br />907
<br />9
<br />0
<br />6
<br />90
<br />5
<br />904904
<br />903902901900899898900902
<br />903908907906905904905906907
<br />904906907908908
<br />909
<br />908
<br />909909
<br />90890990890591
<br />0
<br />9119119
<br />1
<br />0
<br />910
<br />909909910909907906909910908907905906
<br />905906904
<br />903
<br />904905906906907907908910909908907906905904909
<br />909
<br />908
<br />907906
<br />905
<br />904
<br />904
<br />906
<br />905
<br />905
<br />908
<br />909
<br />910 910910910
<br />9109
<br />1
<br />0 909909908
<br />907
<br />907
<br />906
<br />907
<br />907
<br />907
<br />906906906905909905907908907905
<br />907
<br />907
<br />906
<br />906
<br />880885890890895900900895890885880910909909908
<br />912880885895900910914915
<br />905
<br />906
<br />907908909
<br />906907909907906906
<br />907
<br />908
<br />906
<br />907
<br />905 913912911910909908907
<br />910905900899904
<br />905
<br />908
<br />904905908903
<br />904905
<br />905
<br />908
<br />906899900901
<br />903904901905 904
<br />906907907905906906906906906907908908908909909910910911911910911
<br />911
<br />910910
<br />909
<br />9109109079119
<br />1
<br />1911911 911
<br />911
<br />911
<br />911
<br />9
<br />1
<br />0
<br />908907907909908907906
<br />906905907906890905906907908909910905910910911912913914916
<br />911911
<br />91
<br />1
<br />911WETLAND ASA-WSA-USTORMWATER WETLANDSTORMWATER WETLANDSTORMWATER INFILTRATIONBASINNEW ADDITIONFFE: 911.40 (ARCH: 100'-0")NEW ADDITIONFFE: 911.40 (ARCH: 100'-0")NEW ADDITIONFFE: 911.40(ARCH: 100'-0")SHEET: C302SHEET: C301SHEET: C304SHEET: C30391090991090990991091191
<br />1910
<br />910911908905904903908907909
<br />9089099109119129131.Tree protection consisting of snow fence or safety fence installed at the drip line shall be in place prior to beginningany grading or demolition work at the site.2.All elevations with an asterisk (*) shall be field verified. If elevations vary significantly, notify the Engineer forfurther instructions.3.Grades shown in paved areas represent finish elevation.4.All construction shall be performed in accordance with state and local standard specifications for construction.5.Permittees must not excavate infiltration systems to final grade, or within three (3) feet of final grade, until thecontributing drainage area has been constructed and fully stabilized unless they provide rigorous erosionprevention and sediment controls (e.g., diversion berms) to keep sediment and runoff completely away from theinfiltration area.GRADING NOTESPROPOSED CONTOURS - MAJOR INTERVALGRADE BREAK LINEPROPOSED CONTOURS - MINOR INTERVAL949950950EXISTING CONTOURS2.0%950.00 TC949.50 GLGRADE SLOPESPOT ABBREVIATIONS:TC - TOP OF CURBGL - GUTTER LINEB - BITUMUNOUSC - CONCRETESYMBOL LEGENDSYMBOL LEGENDCITY OF LAKE ELMOSITE RESTORATION PLAN NOTES1.RESTORE ALL DISTURBED AREAS WITH 6 INCHES OF TOPSOIL CONFORMING TO MNDOT 3877.2.PROTECT ALL STORM SEWER INLETS AS SPECIFIED HEREIN AND MAINTAIN UNTIL STREETCONSTRUCTION IS COMPLETED.3.MAINTAIN ALL SILT FENCE AND REPAIR OR REPLACE AS NEEDED OR REQUIRED UNTIL TURF HAS BEENESTABLISHED.4.RESTORATION WORK SHALL BEGIN WITHIN 7 DAYS OF FINAL GRADING.5.BOULEVARD AND DITCH RESTORATION INCLUDES FINE GRADING, WHICH INCLUDES THE REMOVAL OF ROCKS,DEBRIS AND SOIL CHUNKS, WHILE MAINTAINING POSITIVE DRAINAGE.1.THE CONTRACTOR SHALL CONDUCT OPERATIONS AND IMPLEMENT MINNESOTA POLLUTION CONTROL AGENCY (MPCA)BEST MANAGEMENT PRACTICES (BMP) TO CONTROL SITE SILTATION AND EROSION INTO DRAINAGE WAYS. THECONTRACTOR SHALL COMPLY WITH ALL CONDITIONS AND COMPLETION DATES RELATIVE TO ALL PERMITS ISSUED FORTHE WORK TO BE COMPLETED. THE ENGINEER MAY ISSUE A STOP WORK ORDER FOR ALL DEVELOPMENT WORK ANDBUILDING CONSTRUCTION FOR NONCOMPLIANCE WITH THESE MEASURES.2.SEQUENCING. ALL SILT FENCE AND OTHER EROSION CONTROL MEASURES SHALL BE IN PLACE AND APPROVED BYENGINEER PRIOR TO ANY REMOVALS, EXCAVATION OR CONSTRUCTION AND SHALL BE MAINTAINED UNTIL VIABLE TURFOR GROUND COVER HAS BEEN ESTABLISHED AND APPROVED BY THE ENGINEER.3.SILT FENCE. THE CONTRACTOR SHALL INSTALL SILT FENCE AT THE LOCATIONS SHOWN ON THE PLANS AND INACCORDANCE WITH THE CITY STANDARD DETAILS. SILT FENCE DAMS AND INTERIM SUMPS SHALL BE PLACED TOINTERCEPT SILT FROM CONCENTRATED RUNOFF FROM OPEN GRADED AREAS. ADDITIONAL SILT FENCE SHALL BEREQUIRED AS DIRECTED BY THE ENGINEER.4.STOCKPILES. ALL STOCKPILE AREAS SHALL HAVE SILT FENCE OR SEDIMENT TRAPPING SYSTEMS PLACED AROUND THEENTIRE PERIMETER.5.INLET PROTECTION. THE CONTRACTOR SHALL INSTALL INLET PROTECTION ON ALL EXISTING STORM SEWER INLETS INACCORDANCE WITH THE CITY STANDARD DETAILS. INLET PROTECTION SHALL ALSO BE PROVIDED ON ALL PROPOSEDSTORM SEWER INLETS IMMEDIATELY FOLLOWING CONSTRUCTION OF THE INLET. INLET PROTECTION MUST BEINSTALLED IN A MANNER THAT WILL NOT IMPOUND WATER FOR EXTENDED PERIODS OF TIME OR IN A MANNER THATPRESENTS A HAZARD TO VEHICULAR OR PEDESTRIAN TRAFFIC.6.TEMPORARY SEDIMENT BASINS. THE CONTRACTOR SHALL INCORPORATE TEMPORARY SEDIMENT BASINS THROUGHOUTTHE CONSTRUCTION SITE TO CAPTURE RUNOFF AND SLOW THE FLOW OF WATER AND ALLOW SEDIMENT TO SETTLEOUT. TEMPORARY SEDIMENT BASINS SHALL BE INSTALLED AS DIRECTED BY THE CITY ENGINEER.7.ROCK CONSTRUCTION ENTRANCE. A ROCK ENTRANCE SHALL BE CONSTRUCTED AND MAINTAINED AS SHOWN ON THEPLAN TO REDUCE TRACKING OF SILT AND DIRT ONTO THE PUBLIC STREETS. A GEOTEXTILE FABRIC SHALL BE PLACEDUNDERNEATH THE ROCK. THE ROCK SHALL BE PERIODICALLY REPLENISHED TO MAINTAIN THE INTENDEDPERFORMANCE. MUD AND DEBRIS SHALL BE REMOVED OR SCRAPED FROM TIRES AND VEHICLE UNDERCARRIAGE PRIORTO LEAVING THE SITE.8.STREET SWEEPING. ALL STREETS USED FOR ACCESS TO THE SITE AND HAUL ROUTES USED FOR CONSTRUCTIONEQUIPMENT AND MATERIAL SUPPLIES SHALL BE CLEANED AT THE END OF EACH WORKING DAY. THE CITY OR ENGINEERMAY ORDER ADDITIONAL SWEEPING OF THE STREETS AS DEEMED REQUIRED AT DEVELOPER/CONTRACTOR EXPENSE.9.DEWATERING. EACH EXCAVATION SHALL BE KEPT DRY DURING THE COURSE OF ALL WORK HEREIN, INCLUDINGSUBGRADE CORRECTION, PIPE INSTALLATION, STRUCTURE CONSTRUCTION AND BACKFILLING, TO THE EXTENT THAT NODAMAGE FROM HYDROSTATIC PRESSURE, FLOATATION OR OTHER DAMAGE RESULTS. ALL EXCAVATIONS SHALL BEDEWATERED TO A DEPTH OF AT LEAST 3 INCHES BELOW THE BOTTOM OF THE CONCRETE SLAB OR PIPE TO BEINSTALLED THEREIN. THE CONTRACTOR MAY USE ANY METHOD OR COMBINATION OF METHODS FOR DEWATERING HECHOOSES; HOWEVER, ALL DEWATERING METHODS AND EQUIPMENT WHICH IN THE OPINION OF THE ENGINEER, AREINEFFECTIVE SHALL BE ABANDONED, IMPROVED, REPLACED OR THERWISE ALTERED TO OBTAIN EFFECTIVEDEWATERING. THE CONTRACTOR SHALL PROVIDE ALL POWER, PUMPS, MATERIALS AND APPARATUS NECESSARY, ANDSHALL BE RESPONSIBLE FOR DISPOSING OF THE WATER PUMPED FROM THE EXCAVATION IN A MANNER WHICH WILL NOTINTERFERE WITH OTHER WORK WITHIN THE AREA AND NOT TO DAMAGE PUBLIC OR PRIVATE PROPERTY. THECONTRACTOR WILL BE HELD RESPONSIBLE FOR THE CONDITION OF ANY PIPE, CONDUIT, DITCH, CHANNEL OR NATURALWATERCOURSE UTILIZED FOR DRAINAGE PURPOSES, AND ALL EROSION, SEDIMENT OR OTHER ADVERSE RESULTS OFTHEIR USE SHALL BE REPAIRED.10.POSITIVE DRAINAGE AND PROTECTION. THE CONTRACTOR SHALL MAINTAIN POSITIVE DRAINAGE THROUGHOUT THESITE AT ALL TIMES. LOW POINTS WITHIN AND ALONG ROADWAYS ARE EXPRESSLY PROHIBITED. THE CONTRACTORSHALL BE RESPONSIBLE FOR TEMPORARY DITCHES, PIPING OR OTHER MEANS TO FACILITATE PROPER DRAINAGEDURING CONSTRUCTION. TO PROTECT PREVIOUSLY GRADED AREAS FROM EROSION, WOOD FIBER BLANKET SHALL BEPLACED IMMEDIATELY ON STEEP SLOPES (1:3 OR GREATER) AND EMBANKMENTS, PERMANENT AND TEMPORARY PONDS,AND OUTLETS AND OVERFLOWS TO PROTECT THE COMPLETED GRADE AND MINIMIZE SILT IN THE RUNOFF.11.DRAINAGE DITCHES. THE NORMAL WETTED PERIMETER OF ANY TEMPORARY OR PERMANENT DRAINAGE DITCH ORSWALE THAT DRAINS WATER FROM ANY PORTION OF THE CONSTRUCTION SITE, OR DIVERTS WATER AROUND THE SITE,MUST BE STABILIZED WITHIN 200 LINEAL FEET FROM THE PROPERTY EDGE, OR FROM THE POINT OF DISCHARGE INTOANY SURFACE WATER. STABILIZATION OF THE LAST 200 LINEAL FEET MUST BE COMPLETED WITHIN 24 HOURS AFTERCONNECTING TO A SURFACE WATER. STABILIZATION OF THE REMAINING PORTIONS OF ANY TEMPORARY ORPERMANENT DITCHES OR SWALES MUST BE COMPLETE WITHIN 14 DAYS AFTER CONNECTING TO A SURFACE WATER ANDCONSTRUCTION IN THAT PORTION OF THE DITCH HAS TEMPORARILY OR PERMANENTLY CEASED. TEMPORARY ORPERMANENT DITCHES OR SWALES THAT ARE BEING USED AS A SEDIMENT CONTAINMENT SYSTEM (WITH PROPERLYDESIGNED ROCK DITCH CHECKS, BIO ROLLS, SILT DIKES, ETC.) DO NOT NEED TO BE STABILIZED. THESE AREAS MUST BESTABILIZED WITHIN 24 HOURS AFTER NO LONGER BEING USED AS A SEDIMENT CONTAINMENT SYSTEM.12.TURF ESTABLISHMENT. ALL EXPOSED SOIL AREAS MUST BE STABILIZED AS SOON AS POSSIBLE TO LIMIT SOIL EROSIONBUT IN NO CASE LATER THAN 14 DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HASTEMPORARILY OR PERMANENTLY CEASED.13.MAINTENANCE AND INSPECTION. EROSION CONTROL MEASURES SHALL BE MAINTAINED THROUGHOUT THECONSTRUCTION AND UNTIL SATISFACTORY ESTABLISHMENT OF PERMANENT GROUND COVER IS OBTAINED. ALLEROSION AND SEDIMENTATION CONTROL MEASURES, AND STORMWATER OUTFALLS MUST BE INSPECTED WEEKLY, ANDWITHIN 24 HOURS OF THE SITE RECEIVING 0.5 INCHES OF RAIN. REPAIRS MUST BE MADE ON THE SAME DAY ORFOLLOWING DAY OF THE INSPECTION. UNSATISFACTORY CONDITIONS NOT REPAIRED OR CLEANED UP WITHIN48-HOURS OF NOTIFICATION SHALL RESULT IN A STOP WORK ORDER, AND/OR SAID WORK SHALL BE COMPLETED ATCONTRACTOR'S EXPENSE.14.REMOVAL. THE CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL TEMPORARY EROSION CONTROL MEASURES,STRUCTURES AND DEVICES ONLY AFTER RECEIVING ENGINEER APPROVAL. ALL DEBRIS, STAKES, AND SILTS ALONG SILTFENCES SHALL BE REMOVED AND DISPOSED OFF SITE. THE CONTRACTOR SHALL HAND RAKE SILTED AREAS ALONG THEFENCE LOCATIONS TO PROVIDE A SMOOTH FINAL GRADE AND SHALL RESTORE THE GROUND SURFACE WITH SEED ORSOD, AS REQUIRED, TO MATCH THE FINISHED GRADE TO THE ADJACENT AREA.15.FINAL STORM SEWER SYSTEM. AT THE COMPLETION OF THE WORK AND BEFORE THE FINAL WALK THROUGH, THECONTRACTOR SHALL REMOVE STORM SEWER INLET PROTECTION MEASURES AND THOROUGHLY FLUSH THE STORMSEWER SYSTEM. SEDIMENT AND DEBRIS SHALL BE COMPLETELY REMOVED AND CLEANED AT THE INLETS, OUTLETS, ANDDOWNSTREAM OF EACH OUTLET. RIPRAP AND GEOTEXTILE FABRIC MAY REQUIRE REPLACEMENT AS DIRECTED BY THEENGINEER TO OBTAIN A LIKE NEW INSTALLATION ACCEPTABLE TO THE CITY16.DITCH CHECK (BIOROLL BLANKET SYSTEM). BIOROLL AND BLANKET SYSTEMS SHALL BE INSTALLED AS DITCH CHECKSONLY IN SPECIFIED LOCATIONS AS APPROVED BY THE CITY ENGINEER. BIOROLLS ARE NOT TO BE UTILIZED IN AREASWHERE VEHICLE AND CONSTRUCTION TRAFFIC OCCUR.17.FLOTATION SILT CURTAIN. FLOTATION SILT CURTAIN SHALL BE UTILIZED WHEN CONSTRUCTION ACTIVITIES OCCURDIRECTLY ADJACENT TO LAKES, STREAMS OR WETLANDS IN ORDER TO CONTAIN SEDIMENTS NEAR THE BANKS OFWORKING AREAS. THE INSTALLATION OF FLOTATION SILT CURTAINS WILL BE REQUIRED AS DIRECTED BY THE CITYENGINEER.18.CONCRETE WASHOUT ONSITE. ALL LIQUID AND SOLID WASTES GENERATED BY CONCRETE WASHOUT OPERATIONS MUSTBE CONTAINED IN A LEAK-PROOF CONTAINMENT FACILITY OR IMPERMEABLE LINER. A COMPACTED CLAY LINER THATDOES NOT ALLOW WASHOUT LIQUIDS TO ENTER GROUND WATER IS CONSIDERED AN IMPERMEABLE LINER. THE LIQUIDAND SOLID WASTES MUST NOT CONTACT THE GROUND, AND THERE MUST NOT BE RUNOFF FROM THE CONCRETEWASHOUT OPERATIONS OR AREAS. LIQUID AND SOLID WASTES MUST BE DISPOSED OF PROPERLY AND IN COMPLIANCEWITH MPCA REGULATIONS. A SIGN MUST BE INSTALLED ADJACENT TO EACH WASHOUT FACILITY TO INFORM CONCRETEEQUIPMENT OPERATORS TO UTILIZE THE PROPER FACILITIES.CITY OF LAKE ELMO GRADING ANDEROSION STANDARD PLAN NOTESEO - EMERGENCY OVERFLOWTW - TOP OF WALLBW - BOTTOM OF WALL (F/G)(*) - EXISTING TO BE VERIFIEDMNCheck:Drawn:Date:Comm:WOLD ARCHITECTSAND ENGINEERS332 Minnesota Street, Suite W2000St. Paul, Minnesota 55101woldae.com | 651 227 7773#EDCBA1234567OAK-LAND MIDDLESCHOOL 2025-26ADDITION ANDRENOVATION820 Manning Ave N,Lake Elmo, MN 55042RevisionsDescriptionDateNumP:\Projects\Projects - 2024\12246044 - Oak-Land MS Addition - Wold\2. Design\B. Drawing Files\12246044 - C300 Grading & Erosion Control Plan.dwg
<br />Independent SchoolDistrict #8341875 Greeley Street SouthStillwater, MN 55082CUP SUBMITTAL08-02-2024MTH08-02-2024122361283524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.PRELIMINARYPLANS - NOT FORCONSTRUCTIONGreg A. Buchal, P.E.Date: Reg. No.:08.02.24I hereby certify that this plan, specifications orreport was prepared by me or under my directsupervision and that I am a duly licensedProfessional Engineer under the laws of thestate of Minnesota.OVERALL:GRADING ANDEROSIONCONTROLPLANC3000NORTH4080160BENCHMARKELEVATIONS ARE BASED MN/DOT GEODETICDATABASE STATION# 33601 (KRAFTHEFERMN 163) WHICH IS LOCATED 3 MILES SOUTHOF LAKE ELMO AND NEAR THE INTERSECTIONOF INTERSTATE 94 AND COUNTY ROAD l 5.ELEVATION=912.4l (NGVD 29)TREE PROTECTIONEASEMENT LINEPROPERTY LINERIGHT OF WAY LINEWETLANDSILT FENCERIP-RAP / ROCK CONST. ENTRANCEINLET PROTECTION
|