Laserfiche WebLink
  <br />    PAGE 3 of 3  <br />PRELIMNARY PLANS/CONSTRUCTION PLANS  <br />1. Existing conditions plan sheets must be revised to include all required existing condition information as  <br />shown on the Topographic Survey plan sheet, including all easements and property lines being labeled and  <br />dimensioned.  <br />2. Utility Plans must be revised to clearly depict public vs. private utility ownership. Watermain layout must  <br />be revised to provide additional and relocated hydrants as directed by the Lake Elmo Public Works Director  <br />and Fire Department. The watermain running north‐south across the property from 10th Street to the  <br />southern school district property line shall be increased to a 12‐inch DIP watermain.  <br />3. The grading plans must be revised to include all design information required by the City design standards,  <br />including all basin and low area 100‐year HWL elevations, all NWL elevations, all building low floor and low  <br />opening elevations, all low area EOF’s, a clear depiction of the EOF flow route throughout the site, all storm  <br />water basin maintenance access roads, and all required stormwater easements.   <br />4. Detail plan sheets must incorporate all City standard details for erosion control and watermain utilities and  <br />all conflicting details must be removed.   <br />  <br />  <br />  <br />  <br />