My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-116
LakeElmo
>
City Council
>
Resolutions (1970's to 2020)
>
2020's
>
2024
>
2024-116
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2025 2:33:21 PM
Creation date
12/4/2024 2:24:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CONCLUSIONS AND DECISION <br />Based on the foregoing, the Applicants' application for a Conditional Use Permit is granted <br />subject to the following conditions: <br />1. The Applicant must enter into a Development Agreement, in the City's standard form, <br />prior to issuance of a notice to proceed or any building permit for work on site. <br />2. Prior to the City signing or approving recording of the Final Plat or Development <br />Agreement, the Applicant shall fully address all comments in the following review <br />memos, or any subsequently revised memo, to the satisfaction of the City: <br />a. City Engineer's memo dated September 23, 2024, <br />b. City Landscape Architect's memo dated September 12, 2024, <br />c. City Fire Chief's memo dated September 18, 2024. <br />d. City Attorney's Plat Opinion. <br />e. Washington County Engineering memo dated September 18, 2024. <br />3. The Applicant may not allow any queuing of traffic accessing this site from occurring on <br />the abutting Lake Elmo Avenue (CSAH 17) and loth Street (CSAH 10). <br />4. The applicant must provide, at applicant's sole cost, dedicated right and left turn lanes <br />along Lake Elmo Avenue (CSAH 17) and 1 Oth Street (CSAH 10), at both new access <br />locations. Turn lanes must be constructed meeting Washington County standards. <br />5. The Applicant must provide a separate trail connection along the Lake Elmo Avenue <br />North Corridor. <br />6. The Applicant must provide at applicant's sole cost, Traffic Control Improvements to be <br />operational with the opening of the school, including a permanent traffic control signal at <br />the new access location along 1 Oth Street North (CSAH 10), complete with crosswalks, <br />and including a temporary wood -pole traffic signal at the intersection of Lake Elmo <br />Avenue (CSAH 17) and loth Street (CSAH 10), complete with crosswalks. The applicant <br />must enter into a cost reimbursement agreement to reimburse the County for design and <br />construction related engineering services for these improvements. <br />7. The Plat must dedicate right-of-way along Lake Elmo Avenue (CSAH 17) and 1 Oth <br />Street (CSAH 10) as required by Washington County and the City. <br />8. All easements as required by the City Engineer and Public Works Director shall be <br />documented on the Final Plat prior to the release of the Final Plat for recording. <br />9. The Final Plat shall not be recorded until the City approves the Final Construction Plans. <br />10. The City will require a cost participation from the Applicant at no more than 50% of the <br />City's cost for the applicant's cost -share of the future intersection improvements at Lake <br />Elmo Avenue (CSAH 17) and loth Street (CSAH 10). <br />11. The Applicant shall provide stormwater management mitigation for all required site <br />improvements, including the County roadway and intersection improvements, County <br />roadway turn lanes, all bituminous trails, and including additional future impervious <br />surfaces, as estimated by Washington County, for the future County roadway <br />
The URL can be used to link to this page
Your browser does not support the video tag.