My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-15-24
LakeElmo
>
City Council
>
City Council - Final Meeting Minutes
>
2020's
>
2024
>
10-15-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2025 7:59:00 PM
Creation date
12/4/2024 3:00:49 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LAKE ELMO CITY COUNCIL MINUTES <br />October 15, 2024 <br />8. Approve Pay Request No. 2 (FINAL) for the 2024 Seal Coat Project <br />9. Approve Release of Warranty Security for Boulder Ponds 2°d and 3`d Addition <br />10. Approve City Comments on the Washington County DRAFT 2025-2029 Capital <br />Improvement Plan <br />11. Approve Well 2 Generator Equipment Plans and Specifications and Authorize Ad for Bids <br />Councilmember Holtz, seconded by Councilmember Hirn, moved TO APPROVE THE <br />CONSENTAGENDA AS PRESENTED. Motion passed 4 -0. <br />ITEM 13: Final Assessment Hearing: Adopt Final Assessment Roll for 2024 Street and <br />Utility Improvements <br />City Engineer Griffin presented a project overview, total costs, assessable properties and final <br />assessment roll for the 2024 Street and Utility Improvements. Discussion held regarding <br />ownership of the Carriage Station park. <br />Councilmember Holts, seconded by Councilmember Hirm, moved TO OPEN THE PUBLIC <br />HEARING. Motion passed 4 — 0. <br />Mayor Cadenhead noted a written objection was received from Ian Steivang and Sarah Harvieux <br />related to damage done to their driveway during the project. <br />Clifford Bujold, 12187 Marquess Lane Cove N., commented on the park transfer and interest <br />charges on assessments. <br />Councilmember Holtz, seconded by Councilmember Hirn, moved TO CLOSE THE PUBLIC <br />HEARING. Motion passed 4 — 0. <br />Councilmember Holtz, seconded by Councilmember Hirn, moved TO APPROVE <br />RESOLUTIONNO. 2024-112, ADOPTING THE FINAL ASSESSMENT ROLL FOR THE <br />2024 STREETAND UTILITYIMPROVEMENTS. Motion passed 4 — 0. <br />ITEM 14: Accept Feasibility Report and Assessment Waiver Agreement for Stillwater <br />Area School District Improvements <br />City Engineer Griffin reviewed the request from ISD 824 for utility extension to Oak Land <br />Middle School and the proposed Lake Elmo Elementary School, noting the location, project <br />scope and total cost summary. <br />Councilmember Holtz, seconded by Councilmember Hirn, MOVED TOAPPROVE <br />RESOLUTIONNO. 2024-110, RECEIVING THE FEASIBILITYREPORTAND CALLING <br />HEARING ON IMPROVEMENT FOR THE STILL WATER AREA SCHOOL DISTRICT <br />UTILITYIMPROVEMENTS. Motion passed 4 — 0. <br />Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.