93
<br />0
<br />93
<br />2
<br />93
<br />4
<br />9
<br />3
<br />6
<br />93
<br />8
<br />938936934932
<br />9329349369389409
<br />3
<br />8
<br />93
<br />6 9109
<br />1
<br />4916
<br />9209
<br />3
<br />4
<br />9
<br />3
<br />6
<br />942944944942940938936934932930918
<br />916
<br />914
<br />912
<br />9
<br />3
<br />8
<br />9
<br />3
<br />0
<br />9
<br />2
<br />8
<br />92
<br />6
<br />9
<br />2
<br />0
<br />9
<br />1
<br />8
<br />9
<br />1
<br />6
<br />91
<br />4
<br />9
<br />1
<br />2
<br />9
<br />1
<br />0908 9
<br />0
<br />6
<br />9
<br />0
<br />4 904906908918
<br />92
<br />0 922906
<br />908
<br />910
<br />912
<br />914916918920922924926928930932934932930928926924922920916918914912910908906
<br />910
<br />910
<br />91
<br />2
<br />914
<br />916 908906 9049029009109109149209229249229149129109169189209229289289
<br />2
<br />8
<br />9
<br />26924922 922926922920914912914916916918912920920922924916918920
<br />922920930918910898 900 90290489890091090091093092091092093092492
<br />2
<br />92
<br />4
<br />9189
<br />3
<br />2
<br />922924926928920918918920922
<br />920922924924926
<br />928
<br />930932934936
<br />942
<br />940
<br />936
<br />934
<br />934
<br />936
<br />938
<br />934
<br />936
<br />938
<br />930 932 934928922924926922924926920922924918924926926922 9008989169189249269
<br />3
<br />2
<br />934936930928926924932930898
<br />908 906 904
<br />NEW ELEMENTARYFFE: 931.00 (ARCH: 100'-0")SOFT SURFACEPLAY AREAHARD SURFACEPLAY AREA1391013101010101010101010101010354254930
<br />9
<br />3
<br />0
<br />930930930925920910930930
<br />930925925925
<br />9309259209209259209159159209259309159209159059009
<br />3
<br />09309359409309359359409309309259209109009159059209159109059009209159159209259209259259259309259
<br />2
<br />5
<br />930 925930920915910
<br />9209209259209
<br />3
<br />5
<br />93
<br />0
<br />940
<br />930
<br />930928929928928927926924926929929928927927926924923 922921928928927926926927928929928927926929923922921921922923924925926927928929928 9279269249239229219199189179169149169179189199219219229239249199189179169149139129119099089079069049039029018998989
<br />2
<br />69279
<br />2
<br />8
<br />9
<br />2
<br />9
<br />9
<br />3
<br />19299329339349369379389399419429299319329339349329339349369379389399419429289299319299289279269
<br />2
<br />6924923922921919918918919918916914912908906904902898917913911909907903901899
<br />9289279269229219199189179169149139129119099089079069049039029018998989199189179169169179189199219229279269249239229219
<br />2
<br />4
<br />92492692692692792892
<br />9
<br />9299289289279269279269
<br />2
<br />4923922 929928927926924923922921929928927926916917918919921
<br />92291491391291190990892191991992192492391992193
<br />8
<br />9
<br />3
<br />6
<br />9
<br />3
<br />7
<br />93
<br />4
<br />9
<br />3
<br />3
<br />9
<br />3
<br />2
<br />9
<br />3
<br />1
<br />937
<br />938
<br />939
<br />941942
<br />936
<br />936
<br />937
<br />938
<br />929
<br />929
<br />931
<br />931SHEET: C302SHEET: C301SHEET: C304SHEET: C30310TH STREET ACCESS SHEET: C305LAKE ELMO AVENUE ACCESS SHEET: C305
<br />1.Tree protection consisting of snow fence or safety fence installed at the drip line shall be in place prior to beginningany grading or demolition work at the site.2.All elevations with an asterisk (*) shall be field verified. If elevations vary significantly, notify the Engineer forfurther instructions.3.Grades shown in paved areas represent finish elevation.4.All construction shall be performed in accordance with state and local standard specifications for construction.5.Permittees must not excavate infiltration systems to final grade, or within three (3) feet of final grade, until thecontributing drainage area has been constructed and fully stabilized unless they provide rigorous erosionprevention and sediment controls (e.g., diversion berms) to keep sediment and runoff completely away from theinfiltration area.GRADING NOTES1.THE CONTRACTOR SHALL CONDUCT OPERATIONS AND IMPLEMENT MINNESOTA POLLUTION CONTROL AGENCY (MPCA)BEST MANAGEMENT PRACTICES (BMP) TO CONTROL SITE SILTATION AND EROSION INTO DRAINAGE WAYS. THECONTRACTOR SHALL COMPLY WITH ALL CONDITIONS AND COMPLETION DATES RELATIVE TO ALL PERMITS ISSUED FORTHE WORK TO BE COMPLETED. THE ENGINEER MAY ISSUE A STOP WORK ORDER FOR ALL DEVELOPMENT WORK ANDBUILDING CONSTRUCTION FOR NONCOMPLIANCE WITH THESE MEASURES.2.SEQUENCING. ALL SILT FENCE AND OTHER EROSION CONTROL MEASURES SHALL BE IN PLACE AND APPROVED BYENGINEER PRIOR TO ANY REMOVALS, EXCAVATION OR CONSTRUCTION AND SHALL BE MAINTAINED UNTIL VIABLE TURFOR GROUND COVER HAS BEEN ESTABLISHED AND APPROVED BY THE ENGINEER.3.SILT FENCE. THE CONTRACTOR SHALL INSTALL SILT FENCE AT THE LOCATIONS SHOWN ON THE PLANS AND INACCORDANCE WITH THE CITY STANDARD DETAILS. SILT FENCE DAMS AND INTERIM SUMPS SHALL BE PLACED TOINTERCEPT SILT FROM CONCENTRATED RUNOFF FROM OPEN GRADED AREAS. ADDITIONAL SILT FENCE SHALL BEREQUIRED AS DIRECTED BY THE ENGINEER.4.STOCKPILES. ALL STOCKPILE AREAS SHALL HAVE SILT FENCE OR SEDIMENT TRAPPING SYSTEMS PLACED AROUND THEENTIRE PERIMETER.5.INLET PROTECTION. THE CONTRACTOR SHALL INSTALL INLET PROTECTION ON ALL EXISTING STORM SEWER INLETS INACCORDANCE WITH THE CITY STANDARD DETAILS. INLET PROTECTION SHALL ALSO BE PROVIDED ON ALL PROPOSEDSTORM SEWER INLETS IMMEDIATELY FOLLOWING CONSTRUCTION OF THE INLET. INLET PROTECTION MUST BEINSTALLED IN A MANNER THAT WILL NOT IMPOUND WATER FOR EXTENDED PERIODS OF TIME OR IN A MANNER THATPRESENTS A HAZARD TO VEHICULAR OR PEDESTRIAN TRAFFIC.6.TEMPORARY SEDIMENT BASINS. THE CONTRACTOR SHALL INCORPORATE TEMPORARY SEDIMENT BASINS THROUGHOUTTHE CONSTRUCTION SITE TO CAPTURE RUNOFF AND SLOW THE FLOW OF WATER AND ALLOW SEDIMENT TO SETTLEOUT. TEMPORARY SEDIMENT BASINS SHALL BE INSTALLED AS DIRECTED BY THE CITY ENGINEER.7.ROCK CONSTRUCTION ENTRANCE. A ROCK ENTRANCE SHALL BE CONSTRUCTED AND MAINTAINED AS SHOWN ON THEPLAN TO REDUCE TRACKING OF SILT AND DIRT ONTO THE PUBLIC STREETS. A GEOTEXTILE FABRIC SHALL BE PLACEDUNDERNEATH THE ROCK. THE ROCK SHALL BE PERIODICALLY REPLENISHED TO MAINTAIN THE INTENDEDPERFORMANCE. MUD AND DEBRIS SHALL BE REMOVED OR SCRAPED FROM TIRES AND VEHICLE UNDERCARRIAGE PRIORTO LEAVING THE SITE.8.STREET SWEEPING. ALL STREETS USED FOR ACCESS TO THE SITE AND HAUL ROUTES USED FOR CONSTRUCTIONEQUIPMENT AND MATERIAL SUPPLIES SHALL BE CLEANED AT THE END OF EACH WORKING DAY. THE CITY OR ENGINEERMAY ORDER ADDITIONAL SWEEPING OF THE STREETS AS DEEMED REQUIRED AT DEVELOPER/CONTRACTOR EXPENSE.9.DEWATERING. EACH EXCAVATION SHALL BE KEPT DRY DURING THE COURSE OF ALL WORK HEREIN, INCLUDINGSUBGRADE CORRECTION, PIPE INSTALLATION, STRUCTURE CONSTRUCTION AND BACKFILLING, TO THE EXTENT THAT NODAMAGE FROM HYDROSTATIC PRESSURE, FLOATATION OR OTHER DAMAGE RESULTS. ALL EXCAVATIONS SHALL BEDEWATERED TO A DEPTH OF AT LEAST 3 INCHES BELOW THE BOTTOM OF THE CONCRETE SLAB OR PIPE TO BEINSTALLED THEREIN. THE CONTRACTOR MAY USE ANY METHOD OR COMBINATION OF METHODS FOR DEWATERING HECHOOSES; HOWEVER, ALL DEWATERING METHODS AND EQUIPMENT WHICH IN THE OPINION OF THE ENGINEER, AREINEFFECTIVE SHALL BE ABANDONED, IMPROVED, REPLACED OR THERWISE ALTERED TO OBTAIN EFFECTIVEDEWATERING. THE CONTRACTOR SHALL PROVIDE ALL POWER, PUMPS, MATERIALS AND APPARATUS NECESSARY, ANDSHALL BE RESPONSIBLE FOR DISPOSING OF THE WATER PUMPED FROM THE EXCAVATION IN A MANNER WHICH WILL NOTINTERFERE WITH OTHER WORK WITHIN THE AREA AND NOT TO DAMAGE PUBLIC OR PRIVATE PROPERTY. THECONTRACTOR WILL BE HELD RESPONSIBLE FOR THE CONDITION OF ANY PIPE, CONDUIT, DITCH, CHANNEL OR NATURALWATERCOURSE UTILIZED FOR DRAINAGE PURPOSES, AND ALL EROSION, SEDIMENT OR OTHER ADVERSE RESULTS OFTHEIR USE SHALL BE REPAIRED.10.POSITIVE DRAINAGE AND PROTECTION. THE CONTRACTOR SHALL MAINTAIN POSITIVE DRAINAGE THROUGHOUT THESITE AT ALL TIMES. LOW POINTS WITHIN AND ALONG ROADWAYS ARE EXPRESSLY PROHIBITED. THE CONTRACTORSHALL BE RESPONSIBLE FOR TEMPORARY DITCHES, PIPING OR OTHER MEANS TO FACILITATE PROPER DRAINAGEDURING CONSTRUCTION. TO PROTECT PREVIOUSLY GRADED AREAS FROM EROSION, WOOD FIBER BLANKET SHALL BEPLACED IMMEDIATELY ON STEEP SLOPES (1:3 OR GREATER) AND EMBANKMENTS, PERMANENT AND TEMPORARY PONDS,AND OUTLETS AND OVERFLOWS TO PROTECT THE COMPLETED GRADE AND MINIMIZE SILT IN THE RUNOFF.11.DRAINAGE DITCHES. THE NORMAL WETTED PERIMETER OF ANY TEMPORARY OR PERMANENT DRAINAGE DITCH ORSWALE THAT DRAINS WATER FROM ANY PORTION OF THE CONSTRUCTION SITE, OR DIVERTS WATER AROUND THE SITE,MUST BE STABILIZED WITHIN 200 LINEAL FEET FROM THE PROPERTY EDGE, OR FROM THE POINT OF DISCHARGE INTOANY SURFACE WATER. STABILIZATION OF THE LAST 200 LINEAL FEET MUST BE COMPLETED WITHIN 24 HOURS AFTERCONNECTING TO A SURFACE WATER. STABILIZATION OF THE REMAINING PORTIONS OF ANY TEMPORARY ORPERMANENT DITCHES OR SWALES MUST BE COMPLETE WITHIN 14 DAYS AFTER CONNECTING TO A SURFACE WATER ANDCONSTRUCTION IN THAT PORTION OF THE DITCH HAS TEMPORARILY OR PERMANENTLY CEASED. TEMPORARY ORPERMANENT DITCHES OR SWALES THAT ARE BEING USED AS A SEDIMENT CONTAINMENT SYSTEM (WITH PROPERLYDESIGNED ROCK DITCH CHECKS, BIO ROLLS, SILT DIKES, ETC.) DO NOT NEED TO BE STABILIZED. THESE AREAS MUST BESTABILIZED WITHIN 24 HOURS AFTER NO LONGER BEING USED AS A SEDIMENT CONTAINMENT SYSTEM.12.TURF ESTABLISHMENT. ALL EXPOSED SOIL AREAS MUST BE STABILIZED AS SOON AS POSSIBLE TO LIMIT SOIL EROSIONBUT IN NO CASE LATER THAN 14 DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HASTEMPORARILY OR PERMANENTLY CEASED.13.MAINTENANCE AND INSPECTION. EROSION CONTROL MEASURES SHALL BE MAINTAINED THROUGHOUT THECONSTRUCTION AND UNTIL SATISFACTORY ESTABLISHMENT OF PERMANENT GROUND COVER IS OBTAINED. ALLEROSION AND SEDIMENTATION CONTROL MEASURES, AND STORMWATER OUTFALLS MUST BE INSPECTED WEEKLY, ANDWITHIN 24 HOURS OF THE SITE RECEIVING 0.5 INCHES OF RAIN. REPAIRS MUST BE MADE ON THE SAME DAY ORFOLLOWING DAY OF THE INSPECTION. UNSATISFACTORY CONDITIONS NOT REPAIRED OR CLEANED UP WITHIN48-HOURS OF NOTIFICATION SHALL RESULT IN A STOP WORK ORDER, AND/OR SAID WORK SHALL BE COMPLETED ATCONTRACTOR'S EXPENSE.14.REMOVAL. THE CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL TEMPORARY EROSION CONTROL MEASURES,STRUCTURES AND DEVICES ONLY AFTER RECEIVING ENGINEER APPROVAL. ALL DEBRIS, STAKES, AND SILTS ALONG SILTFENCES SHALL BE REMOVED AND DISPOSED OFF SITE. THE CONTRACTOR SHALL HAND RAKE SILTED AREAS ALONG THEFENCE LOCATIONS TO PROVIDE A SMOOTH FINAL GRADE AND SHALL RESTORE THE GROUND SURFACE WITH SEED ORSOD, AS REQUIRED, TO MATCH THE FINISHED GRADE TO THE ADJACENT AREA.15.FINAL STORM SEWER SYSTEM. AT THE COMPLETION OF THE WORK AND BEFORE THE FINAL WALK THROUGH, THECONTRACTOR SHALL REMOVE STORM SEWER INLET PROTECTION MEASURES AND THOROUGHLY FLUSH THE STORMSEWER SYSTEM. SEDIMENT AND DEBRIS SHALL BE COMPLETELY REMOVED AND CLEANED AT THE INLETS, OUTLETS, ANDDOWNSTREAM OF EACH OUTLET. RIPRAP AND GEOTEXTILE FABRIC MAY REQUIRE REPLACEMENT AS DIRECTED BY THEENGINEER TO OBTAIN A LIKE NEW INSTALLATION ACCEPTABLE TO THE CITY16.DITCH CHECK (BIOROLL BLANKET SYSTEM). BIOROLL AND BLANKET SYSTEMS SHALL BE INSTALLED AS DITCH CHECKSONLY IN SPECIFIED LOCATIONS AS APPROVED BY THE CITY ENGINEER. BIOROLLS ARE NOT TO BE UTILIZED IN AREASWHERE VEHICLE AND CONSTRUCTION TRAFFIC OCCUR.17.FLOTATION SILT CURTAIN. FLOTATION SILT CURTAIN SHALL BE UTILIZED WHEN CONSTRUCTION ACTIVITIES OCCURDIRECTLY ADJACENT TO LAKES, STREAMS OR WETLANDS IN ORDER TO CONTAIN SEDIMENTS NEAR THE BANKS OFWORKING AREAS. THE INSTALLATION OF FLOTATION SILT CURTAINS WILL BE REQUIRED AS DIRECTED BY THE CITYENGINEER.18.CONCRETE WASHOUT ONSITE. ALL LIQUID AND SOLID WASTES GENERATED BY CONCRETE WASHOUT OPERATIONS MUSTBE CONTAINED IN A LEAK-PROOF CONTAINMENT FACILITY OR IMPERMEABLE LINER. A COMPACTED CLAY LINER THATDOES NOT ALLOW WASHOUT LIQUIDS TO ENTER GROUND WATER IS CONSIDERED AN IMPERMEABLE LINER. THE LIQUIDAND SOLID WASTES MUST NOT CONTACT THE GROUND, AND THERE MUST NOT BE RUNOFF FROM THE CONCRETEWASHOUT OPERATIONS OR AREAS. LIQUID AND SOLID WASTES MUST BE DISPOSED OF PROPERLY AND IN COMPLIANCEWITH MPCA REGULATIONS. A SIGN MUST BE INSTALLED ADJACENT TO EACH WASHOUT FACILITY TO INFORM CONCRETEEQUIPMENT OPERATORS TO UTILIZE THE PROPER FACILITIES.CITY OF LAKE ELMO GRADING ANDEROSION STANDARD PLAN NOTESP:\Projects\Projects - 2023\12236128 - New Stillwater Elementary School - Wold\C. Design\Drawing Files\12236128 - C300 Grading & Erosion Control Plan.dwg
<br /> 08-23-2024 PRELIMINARYPLAT SUBMITTALRevisionsDescriptionDateNumNorthCheck:Drawn:Date:Comm:MTH08-23-2024122361283524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comC 2024 Larson Engineering, Inc. All rights reserved.3524 Labore RoadWhite Bear Lake, MN 55110651.481.9120 (f) 651.481.9201www.larsonengr.comLarsonEngineering, Inc.Greg A. Buchal, P.E.Date: Lic. No.:08.23.202423793I hereby certify that this plan, specifications or reportwas prepared by me or under my direct supervisionand that I am a duly licensed Professional Engineerunder the laws of the state of Minnesota.INDEPENDENT SCHOOLDISTRICT #834New Lake ElmoElementary School1875 Greeley St S, Stillwater, MN55082Corner of 10th Streen North andLake Elmo Avenue NorthLake Elmo MN 55042AFEDCBA12345678MNOVERALL:GRADING ANDEROSIONCONTROLPLANC3000NORTH4080160SYMBOL LEGENDSYMBOL LEGENDPROPOSED CONTOURS - MAJOR INTERVALGRADE BREAK LINEPROPOSED CONTOURS - MINOR INTERVAL949950950EXISTING CONTOURS2.0%950.00 TC949.50 GLGRADE SLOPESPOT ABBREVIATIONS:TC - TOP OF CURBGL - GUTTER LINEB - BITUMUNOUSC - CONCRETEG - GRADEEOF - EMERGENCY OVERFLOWOF - OVERFLOWTW - TOP OF WALLBW - BOTTOM OF WALL (F/G)AG - AGLIME(*) - EXISTING TO BE VERIFIEDEASEMENT LINEPROPERTY LINERIGHT OF WAY LINEBENCHMARKELEVATIONS BASED ON INFORMATION ASSHOWN ON THE TKDA WATERMAIN PLANS -SHEET C502 DATED 4/15/2014. TOP NUTHYDRANT 400 ' N. OF 10TH STREET.ELEVATION = 939.37
|