Laserfiche WebLink
uu <br />�c�. �+ersox sae <br />MEDI <br />g) Standards, installation and Mmaintenance and- installation of plant and landscape materials. The preparation, linstallation, <br />and maintenance of all landscape materials shall comply with the following standards unless otherwise stipulated in the <br />City's Landscape Special Provisions: <br />1. All landscape materials installation and maintenance shall he4nstalle4-te-surrgnt-cornI with' the City' <br />Landscape Special Provisions and the Minnesota Department of Transportation Standard Specifications Section <br />2571 and Standard Plan 5-297 301 Standard Planting Details A-C. Speeial <br />preparation, 6 fand proper <br />2. A pre -installation conference between the City's Landscape Architect developer/builder, and landscape contractor <br />shall be required prior to the installation of any code required plantings or seeding Any landscaping material not <br />required for erosion control installed without a pre -installation conference will be rejected <br />a. Prior to the conference both developer and the developer's contactor shall have reviewed the pre <br />- <br />installation checklist included in the City's Landscape Special Provisions to gain familiarity with the <br />requirements and identify areas needing clarification <br />3. 1..."� v _r supply the-sp gaateWatering of all plant materials and <br />ground cover in the approved development plan shall be provided at the time of or immediately after, plant <br />P P � - � r,...., <br />installation to support establishment and shall continue through the entire warranty period The watering <br />requirements are set forth in the Minnesota Department of Transportation Specification Section 2571 <br />4. All required landscaping and screening features shall be kept free of refuse and debris, and noxious weeds. <br />5. All landscape landscaping, mulch depthbeds, plantings, and seeded; and sodded areas shall be maintained to manage <br />noxious weeds and ensure establishment of intended plant materials. <br />6. All r-.anddssa materials -shall be guafameed for two years. Any landsoape material that dies, <br />hadead_orbTekon <br />�ead -9A%or more orown death, i., damaged by oonstruction, or becomes ]:_eased-before-ho-oad <br />of the seeend year er, <br />6. For nonresidential projects, continuing maintenance and replacement of landscape materials shall be the <br />responsibility of the property owner, including after two years of initial installation. Improvements identified on the <br />landscape plan, including non -plant materials, such as fencing, shall be maintained for the life of the project for <br />which the plan was required. <br />h) Topsoil Borrow Requirements. Earthwork and topsoil shall comply with the following standards: <br />1. The topsoil e stoc ile location and erosion controls shall be called out in the plan set when building permit <br />for new residential or commercial construction is submitted to the eChy. All areas disturbed, outside ofpaved areas, <br />shall be excavated to a depth offour (4) inches and tilled to a depth ofsix (6) inches ire to remove compaction. The <br />depth of the topsoil borrow shall be no less than four (4) inches, not including sod depth. <br />2. Only topsoil borrow meeting MinnesotaNDepartment of Transportation,0T Speci ication 3877 as modified to <br />contain no less than 6% organic matter, is to be placed as the final soil layer on a site to provide the required depth <br />of topsoil borrow cover an -and to bring the entire site to grade. <br />3. Confirmation of topsoil depth and quality shall be submitted as written confirmation from a licensed party before a <br />full,Ccertificate ofOoccupancy is issued. <br />Warran <br />1. All landscape materials shall be guaranteed for a period of at least two years <br />a. The warranty begins when all approved development plan landscaping meets all required acceptance <br />criteria, as determined by the City's Landscape Architect, from the Lake Elmo Code Section 105.12.480, <br />the City's Landscape Special Provisions and in the Minnesota Department of Transportation Standard <br />Specifications Section 2571 and Standard Plan 5-297 301 Standard Planting Details A-C <br />b. The warranty period ends when all approved development plan landscaping meets the requirements as <br />determined by the City's Landscape Architect, listed in Lake Elmo Code Section 105 12 480(i)(1)(a) <br />