My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#16 - UP Railroad At-Grade Crossing Agreement
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
11-19-24
>
#16 - UP Railroad At-Grade Crossing Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2025 4:34:06 PM
Creation date
4/1/2025 11:59:27 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br />Public Highway At-Grade Crossing Agreement <br />DOT DOT# 980280H, Project 0787250 <br /> UP File Folder No. 0787250 <br /> <br />D. If the Political Body's own employees will be performing any of the Project <br />work, the Political Body may self-insure all or a portion of the insurance coverage subject <br />to the Railroad's prior review and approval. <br /> <br />Section 5. FEDERAL AID POLICY GUIDE <br /> <br /> If the Political Body will be receiving any federal funding for the Project, the current <br />rules, regulations and provisions of the Federal Aid Policy Guide as contained in 23 CFR <br />140, Subpart I and 23 CFR 646, Subparts A and B are incorporated into this Agreement <br />by reference. <br /> <br />Section 6. NO PROJECT EXPENSES TO BE BORNE BY RAILROAD <br /> <br /> The Political Body agrees that no Project costs and expenses are to be borne by <br />the Railroad. In addition, the Railroad is not required to contribute any funding for the <br />Project. <br /> <br />Section 7. WORK TO BE PERFORMED BY RAILROAD; BILLING SENT <br /> TO POLITICAL BODY; POLITICAL BODY'S PAYMENT OF BILLS <br /> <br />A. The work to be performed by the Railroad, at the Political Body's sole cost <br />and expense, is described in the Railroad's Material and Force Account Estimate for <br />Surface dated October 13, 2023, and Railroad’s Material and Force Account Estimate for <br />Signal dated March 20, 2024 marked Exhibit C, attached hereto and hereby made a part <br />hereof (the "Estimate"). As set forth in the Estimate, the Railroad's estimated cost for the <br />Railroad's work associated with the Project is Five Hundred Thirty Four Thousand Two <br />Hundred and Ninety-Eight Dollars ($534,293.00). <br /> <br />B. The Railroad, if it so elects, may recalculate and update the Estimate <br />submitted to the Political Body in the event the Political Body does not commence <br />construction on the portion of the Project located on the Railroad’s property within six (6) <br />months from the date of the Estimate. <br /> <br />C. The Political Body acknowledges that the Estimate does not include any <br />estimate of flagging or other protective service costs that are to be paid by the Political <br />Body or the Contractor in connection with flagging or other protective services provided <br />by the Railroad in connection with the Project. All of such costs incurred by the Railroad <br />are to be paid by the Political Body or the Contractor as determined by the Railroad and <br />the Political Body. If it is determined that the Railroad will be billing the Contractor directly <br />for such costs, the Political Body agrees that it will pay the Railroad for any flagging costs <br />that have not been paid by any Contractor within thirty (30) days of the Contractor's <br />receipt of billing. <br /> <br />D. The Railroad shall send progressive billing to the Political Body during the
The URL can be used to link to this page
Your browser does not support the video tag.