My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#20 - Easton Village 7th Addition DA Amendment
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
11-19-24
>
#20 - Easton Village 7th Addition DA Amendment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2025 4:34:05 PM
Creation date
4/1/2025 12:01:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
reflect the extended completion date. Final wear course placement outside of this time frame <br />must have the written approval of the City Engineer. <br />12. MAINTENANCE DURING CONSTRUCTION. The Developer shall be responsible <br />for all maintenance of the Subdivision Improvements including the snow plowing of the streets, <br />roads and alleys until the Subdivision Improvements are accepted by the City in writing. The <br />Developer is also responsible to locate all underground utilities until the Subdivision is accepted <br />in writing by the City. The Developer sh~II place warning signs when hazards develop in streets <br />to prevent the public from traveling on same and to direct attention to detours. If and when <br />streets become impassable, the Developer shall barricade and close such streets. In the event <br />residences are occupied before completing streets, the Developer shall maintain a smooth <br />surface and provide proper surface drainage to ensure that the streets are passable for traffic <br />and emergency vehicles. The Developer shall be responsible for keeping streets within and <br />without the Subdivision clean and clear of dirt and debris that may spill, track, or wash onto the <br />street from the Developer's operations. The Developer shall contract for street cleaning for <br />streets within and immediately adjacent to the Subdivision. At a minimum, scraping and <br />sweeping shall take place on a weekly basis. <br />Before the City's acceptance of the streets the City may agree, at the City's sole <br />discretion, to keep the streets open during winter months by plowing snow. The City will <br />consider snow plowing streets on a case-by-case basis and under the following conditions: 1) <br />the Developer must request in writing the streets it is requesting to be plowed by the City, with <br />such request received prior to October 1st of each winter season that plowing is requested; 2) <br />there must be residences along the street; 3) for streets that do not have the bituminous wear <br />course placed, the Developer must install paved wedges along all curb lines and catch basins of <br />the street; 4) gate valves and manholes must be level with the pavement surface; 5) street <br />curves, center medians, and other protrusions in the right-of-ways must be delineated with "HI- <br />7
The URL can be used to link to this page
Your browser does not support the video tag.