My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#20 - Easton Village 7th Addition DA Amendment
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
11-19-24
>
#20 - Easton Village 7th Addition DA Amendment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2025 4:34:05 PM
Creation date
4/1/2025 12:01:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
warranty period to perform the work if the Developer fails to take corrective measures after <br />being provided reasonable notice by the City. <br />27. BUILDING PERMITS/CERTIFICATES OF OCCUPANCY. <br />A. The City will not issue a building permit for any lot within the Subdivision, or within <br />a completed phase of the Subdivision in a City preapproved phasing plan, until <br />such time that sanitary sewer, water, storm sewer, curbing and one lift of asphalt <br />has been installed and tested for all public streets; boulevard grading has been <br />completed within the entire right-of-way (without hold down grading for the future <br />sidewalk or any other improvements); street and traffic control signs are installed; <br />property monuments have been installed; and grading as-built plans have been <br />submitted and approved by the City. A "preapproved phasing plan" is defined as a <br />phased construction plan that has been submitted by the Developer and approved <br />by the City in advance of the preconstruction meeting for the Subdivision. Once <br />the construction has started, the City will not consider revisions to the phasing plan <br />for the purpose of issuing building permits. <br />B. The City Planning Director may authorize the issuance of a single building permit <br />for a "model home" before the completion of the Subdivision Improvements <br />described in paragraph 27 (A) above, if there is safe public access to the lot that is <br />sufficient to allow construction to proceed and there is a grading as-built plan <br />approved by the City for the lot and all downstream storm water drainage facilities. <br />However, the City will not issue a certificate of occupancy for any "model home" <br />until all conditions identified in paragraph 27 (A) above have been completed. The <br />Developer shall use the model home only for real estate sales purposes and no <br />other purposes. <br />C. Before the City issues any building permits, the Developer shall place wetland <br />14
The URL can be used to link to this page
Your browser does not support the video tag.