My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#11 - Pedestriam Crosswalk Marking
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
12-03-24
>
#11 - Pedestriam Crosswalk Marking
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2025 4:31:48 PM
Creation date
4/1/2025 12:12:09 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jack Griffin, PE November 27, 2024 <br />City of Lake Elmo Page 2 <br />For signage, both crosswalks will have advanced pedestrian crossing warning signage <br />before the crosswalk and at the crossing location with a downward arrow. In all, 4 30” x <br />30” W11-2 signs, 2 24”x 12” W16-7PL signs, and 2 24” x 12” W16-9P signs will be used. <br />A W11-2 and W16-9P will be placed 100 feet ahead of the crosswalk in each direction <br />while a W11-2 and W16-7PL will be place at the crosswalk. <br />For the crosswalk markings, preformed thermoplastic pavement markings will be applied <br />into grooves that have been cut into the roadway surface at the crosswalk with ADA <br />accessible ramps. The markings will be 6’ x 3’ with 3’ spacing between each marking. <br />3. Estimation of cost <br />The estimated cost for these improvements is $4,000 per intersection or a total of $8,000 <br />based on the breakdown below. <br /> <br />· Crosswalk = $15/SF <br />o 3’ x 6’ x 5 = 90 SF <br />o 90 SF x $15/SF = $1,350 <br />· Sign = $80/SF <br />o (30” x 30” + 24” x 12”) x 4 = 33 SF <br />o 33 SF x $80/SF = $2,640 <br />· Total = Approximately $4,000 per intersection <br />
The URL can be used to link to this page
Your browser does not support the video tag.