Laserfiche WebLink
PARTIAL PAY ESTIMATE NO.9(Final) <br />TAPESTRY SANITARY SEWER EXTENSION 9-Final <br />CITY OF LAKE ELMO, MINNESOTA <br />PROJECT NO. 2020.120 <br />QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT <br />1 LS 1 <br />$70,450.00 $70,450.00 0.00 $0.00 1.00 $70,450.00 <br />2 LS 1 <br />$5,000.00 $5,000.00 0.00 $0.00 1.00 $5,000.00 <br />3 EA 3 <br />$140.00 $420.00 0.00 $0.00 3.00 $420.00 <br />4 LF 735 <br />$2.00 $1,470.00 0.00 $0.00 503.00 $1,006.00 <br />5 LF 70 <br />$8.00 $560.00 0.00 $0.00 43.00 $344.00 <br />6 EA 13 <br />$400.00 $5,200.00 0.00 $0.00 13.00 $5,200.00 <br />7 EA 4 <br />$400.00 $1,600.00 0.00 $0.00 5.00 $2,000.00 <br />8 SY 20 <br />$30.00 $600.00 0.00 $0.00 0.00 $0.00 <br />9 LF 105 <br />$12.00 $1,260.00 0.00 $0.00 105.00 $1,260.00 <br />10 EA 1 <br />$3,200.00 $3,200.00 0.00 $0.00 1.00 $3,200.00 <br />11 LS 1 <br />$5,000.00 $5,000.00 0.00 $0.00 1.00 $5,000.00 <br />12 EA 1 <br />$8,100.00 $8,100.00 0.00 $0.00 1.00 $8,100.00 <br />13 EA 1 <br />$100.00 $100.00 0.00 $0.00 1.00 $100.00 <br />14 EA 1 <br />$6,100.00 $6,100.00 0.00 $0.00 1.00 $6,100.00 <br />15 LBS 270 <br />$18.00 $4,860.00 0.00 $0.00 192.00 $3,456.00 <br />16 EA 1 <br />$7,388.00 $7,388.00 0.00 $0.00 1.00 $7,388.00 <br />17 EA 2 <br />$1,950.00 $3,900.00 0.00 $0.00 2.00 $3,900.00 <br />18 LF 2,390 <br />$44.00 $105,160.00 0.00 $0.00 2,390.00 $105,160.00 <br />19 LF 172 <br />$112.00 $19,264.00 0.00 $0.00 171.00 $19,152.00 <br />20 EA 1 <br />$17,850.00 $17,850.00 0.00 $0.00 1.00 $17,850.00 <br />21 EA 1 <br />$12,500.00 $12,500.00 0.00 $0.00 1.00 $12,500.00 <br />22 LS 1 <br />$10,000.00 $10,000.00 0.00 $0.00 1.00 $10,000.00 <br />23 EA 1 <br />$5,800.00 $5,800.00 0.00 $0.00 1.00 $5,800.00 <br />24 EA 14 <br />$200.00 $2,800.00 0.00 $0.00 14.00 $2,800.00 <br />25 LF 172 <br />$8.00 $1,376.00 0.00 $0.00 171.00 $1,368.00 <br />26 LS 1 <br />$414,866.00 $414,866.00 0.00 $0.00 1.00 $414,866.00 <br />27 EA 4 <br />$180.00 $720.00 0.00 $0.00 5.00 $900.00 <br />28 LF 60 <br />$61.00 $3,660.00 0.00 $0.00 26.00 $1,586.00 <br />29 EA 1 <br />$400.00 $400.00 0.00 $0.00 0.00 $0.00 <br />30 LF 50 <br />$5.00 $250.00 0.00 $0.00 50.00 $250.00 <br />31 LF 15 <br />$10.00 $150.00 0.00 $0.00 10.00 $100.00 <br />32 SY 275 <br />$9.00 $2,475.00 0.00 $0.00 275.00 $2,475.00 <br />33 SF 200 <br />$3.00 $600.00 0.00 $0.00 130.00 $390.00 <br />34 LF 200 <br />$6.00 $1,200.00 0.00 $0.00 200.00 $1,200.00 <br />35 CY 440 <br />$18.00 $7,920.00 0.00 $0.00 440.00 $7,920.00 <br />36 TN 325 <br />$22.00 $7,150.00 0.00 $0.00 362.85 $7,982.70 <br />37 TN 440 <br />$17.00 $7,480.00 0.00 $0.00 366.20 $6,225.40 <br />38 TN 140 <br />$140.00 $19,600.00 0.00 $0.00 165.25 $23,135.00 <br />39 GAL 50 <br />$7.00 $350.00 0.00 $0.00 0.00 $0.00 <br />40 SF 200 <br />$12.00 $2,400.00 0.00 $0.00 130.00 $1,560.00 <br />41 SY 72 <br />$108.00 $7,776.00 0.00 $0.00 66.70 $7,203.60 <br />42 CY 300 <br />$1.00 $300.00 0.00 $0.00 8.00 $8.00 <br />43 SY 300 <br />$6.00 $1,800.00 0.00 $0.00 0.00 $0.00 <br />44 SY 2,540 <br />$6.00 $15,240.00 0.00 $0.00 4,534.00 $27,204.00 <br />45 HR 10 <br />$150.00 $1,500.00 0.00 $0.00 0.00 $0.00 <br />$795,795.00 $0.00 $800,559.70 <br />CO1-1 LS 1 <br />$1,705.00 $1,705.00 0.00 $0.00 1.00 $1,705.00 <br />CO1-2 LS 1 <br />$1,149.00 $1,149.00 0.00 $0.00 1.00 $1,149.00 <br />CO1-3 LS 1 <br />$4,895.00 $4,895.00 0.00 $0.00 1.00 $4,895.00 <br />$7,749.00 $0.00 $7,749.00 <br />CO 2-1 LS 1 <br />$15,239.40 $15,239.40 0.00 $0.00 0.00 $0.00 <br />$15,239.40 $0.00 $0.00 <br />CO 3-1 LS 1 <br />-$10,474.70 -$10,474.70 0.00 $0.00 0.00 $0.00 <br />-$10,474.70 $0.00 $0.00 <br />TOTALS - CONTRACT $808,308.70 $0.00 $808,308.70 <br />UPSIZED VFDs <br />CHANGE ORDER 2 <br />TEMPORARY ELECTRICAL SERVICE <br />TOTAL CHANGE ORDER 2 <br />CHANGE ORDER 3 <br />COMPENSATING CHANGE ORDER <br />TOTAL CHANGE ORDER 3 <br />CHANGE ORDER 1 <br />TEMPORARY MULCHING <br />PUMPING OF EXISTING LIFT STATION <br />TOTAL BASE BID <br />COAT MANHOLE <br />CONSTRUCT INVERT <br />BYPASS PUMPING <br />CORE DRILL CONNECTION TO EXISTING STRUCTURE <br />TRAFFIC CONTROL <br />INLET PROTECTION <br />SILT FENCE, MACHINE SLICED <br />SEDIMENT CONTROL LOG, TYPE WOOD FIBER <br />CLEARING <br />GRUBBING <br />CLEAR BRUSH <br />REMOVE SANITARY SEWER PIPE <br />BASE BID <br />MOBILIZATION <br />CONNECT TO EXISTING 8" SANITARY SEWER <br />CONNECT TO EXISTING 10" SANITARY SEWER <br />DUCTILE IRON FITTINGS <br />ITEM DESCRIPTION OF PAY ITEM UNIT <br />CONTRACT THIS PERIOD TOTAL TO DATE <br />OFF ROAD STRUCTURE MARKER <br />TOTAL CHANGE ORDER 1 <br />TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE (2,B) <br />REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT <br />REMOVE AND DISPOSE OF EXISTING CONCRETE WALK <br />REMOVE FENCE <br />EXCAVATION - COMMON (EV) (P) <br />AGGREGATE BASE, CLASS 6 <br />SELECT GRANULAR BORROW <br />6" CONCRETE LIFT STATION PAD <br />TOPSOIL BORROW (LV) <br />SEED MIXTURE 25-151 & HYDRAULIC MULCH <br />SEED MIXTURE 35-241 & EROSION CONTROL BLANKET <br />STREET SWEEPER WITH PICK UP BROOM <br />SALVAGE AND REINSTALL 18" CPP STORM SEWER PIPE <br />SEAL MANHOLE JOINT <br />6" HDPE SANITARY FORCEMAIN, DIRECTIONAL DRILL <br />8" PVC SANITARY SEWER PIPE, SDR 26 <br />4' DIAMETER SANITARY AIR RELEASE MANHOLE, INCL CASTING AND RINGS <br />4' DIAMETER SANITARY MANHOLE, INCL CASTING AND RINGS <br />REMOVE EXISTING LIFT STATION COMPONENTS <br />REPLACE EXISTING LIFT STATION TOP SECTION, FURNISH & INSTALL CASTING <br />FURNISH AND INSTALL STEPS IN EXISTING LIFT STATION <br />TELEVISING <br />LIFT STATION <br />SALVAGE AND REINSTALL STORM SEWER STRUCTURE <br />SAWCUT BITUMINOUS PAVEMENT <br />SAWCUT CONCRETE PAVEMENT <br />4" CONCRETE WALK <br />BITUMINOUS MATERIAL FOR TACK COAT