Laserfiche WebLink
WELL NO. 2 WATER TREATMENT PLANT <br />PROJECT NO. 2023.115 <br />CITY OF LAKE ELMO, MINNESOTA <br />ENGINEER'S OPINION OF PROBABLE COST <br />WATER TREATMENT PLANT CONSTRUCTION $2,079,607 <br />Water Treatment Plant General Construction Contract $1,360,650 <br />Aqueous Vets Water Treatment Equipment $407,374 <br />Aqueous Vets Prerinsed Anion Exchange (IX) Media $253,597 <br />Cummins 150 KW Natural Gas Engine Generator $57,987 <br />Contingencies at 5%$104,393 <br />Engineering Services: Plans, Bidding, Construction Administration $270,000 <br />Utility Extensions and upsizing $0 <br />Material Testing $4,000 <br />Permitting (MDH, DOLI)$2,000 <br />TOTAL ESTIMATED PROJECT COST ‐ PUBLIC SANITARY SEWER $2,460,000 <br />MPCA Grant Amount $2,283,000 <br />‐$177,000 <br />DECEMBER 2024