Laserfiche WebLink
UP <br />RR <br />Crossing <br />- <br />Village <br />Parkway <br />2025 thru 2034 <br />Infrastructure - Streets - Detail <br />Lake Elmo, MN <br />Project #PW-120 <br />Project Name UP RR Crossing - Village Parkway <br />Contact Engineer Department Public Works Department <br />Category Street Construction Priority 3 Important <br />Status Active Useful Life 40 years <br />Old Project Number PW-035 <br />Description <br />Construction of the street, trail and sidewalk segment of Village Parkway that crosses the Union Pacific Railroad (UPRR) and railroad right-of-way, including trunk watermain extension across the railroad right-of-way with pressure <br />reduction valve (to be installed with development), and closure of the adjacent private railroad crossing (separate project PW-120-2). To obtain permitting and approvals, the project includes potential upgrades to the UPRR crossing <br />at Klondike Avenue. <br />Justification <br />Village Parkway crossing is needed to connect the developing Village neighborhoods north and south of the tracks, including pedestrian connectivity for a walkable downtown area. The Private closure (DOT 183913SD) and <br />potential improvements to Klondike Avenue (DOT 183811D) are requirements of the Railroad for obtaining the new improved crossing location. <br />Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total <br />Construction/Maintenance 960,200 0 0 0 0 0 0 0 0 0 960,200 <br />Total 960,200 0 0 0 0 0 0 0 0 0 960,200 <br />Funding <br />Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total <br />Infrastructure Reserve Fund (409)960,200 0 0 0 0 0 0 0 0 0 960,200 <br />Total 960,200 0 0 0 0 0 0 0 0 0 960,200 <br />Produced Using Plan-It CIP Software