Laserfiche WebLink
WL6 <br />- <br />Well <br />6 <br />- <br />Future <br />Well <br />& <br />Site <br />Acquisition <br />2025 thru 2034 <br />Infrastructure - Water - Detail <br />Lake Elmo, MN <br />Project #W-021 <br />Project Name WL6 - Well 6 - Future Well & Site Acquisition <br />Contact Engineer Department Water Department <br />Category Water Priority 1 Critical <br />Status Active Useful Life 40 years <br />Old Project Number W-037 <br />Description <br />New water supply well to be operationally ready for use with new Treatment Plant. Monitoring well as required by the DNR. Test Well in 2025; Production Well and Site Acquisition in 2025; Well 6 and Treatment Plant ready for <br />early 2027 start-up. (Treatment Plant is separate project - TP1) <br />Justification <br />Needed to replace lost production from Well 2 and to meet growing water demands from growth in water system users both in and outside of MUSA. Treatment Plant (separate project) required to address PFAS in groundwater <br />supply. <br />Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total <br />Construction/Maintenance 750,000 0 0 0 0 0 0 0 0 0 750,000 <br />Total 750,000 0 0 0 0 0 0 0 0 0 750,000 <br />Funding <br />Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total <br />Water Fund 750,000 0 0 0 0 0 0 0 0 0 750,000 <br />Total 750,000 0 0 0 0 0 0 0 0 0 750,000 <br />Produced Using Plan-It CIP Software