Laserfiche WebLink
Hudson <br />Boulevard <br />Culvert <br />Repair <br />2025 thru 2034 <br />Infrastructure - Stormwater - Detail <br />Lake Elmo, MN <br />Project #SW-006 <br />Project Name Hudson Boulevard Culvert Repair <br />Contact Engineer Department Storm Water Department <br />Category Storm Sewer/Drainage Priority 2 Very Important <br />Status Active Useful Life 25 years <br />Description <br />Hudson Boulevard Culvert Lining Repair (72-inch HDPE Liner in 84-inch CMP). <br />Install 72-inch HDPE Liner in existing failed 84-inch CMP culvert. <br />Cost: $300,000 to $400,000 <br />Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total <br />Construction/Maintenance 400,000 0 0 0 0 0 0 0 0 0 400,000 <br />Total 400,000 0 0 0 0 0 0 0 0 0 400,000 <br />Funding <br />Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total <br />Storm Water Fund 400,000 0 0 0 0 0 0 0 0 0 400,000 <br />Total 400,000 0 0 0 0 0 0 0 0 0 400,000 <br />Produced Using Plan-It CIP Software