My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#14 - 2025-2034 Capital Improvement Plan
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
12-17-24
>
#14 - 2025-2034 Capital Improvement Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2025 4:30:21 PM
Creation date
4/1/2025 12:26:34 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
383
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hudson <br />Boulevard <br />Culvert <br />Repair <br />2025 thru 2034 <br />Infrastructure - Stormwater - Detail <br />Lake Elmo, MN <br />Project #SW-006 <br />Project Name Hudson Boulevard Culvert Repair <br />Contact Engineer Department Storm Water Department <br />Category Storm Sewer/Drainage Priority 2 Very Important <br />Status Active Useful Life 25 years <br />Description <br />Hudson Boulevard Culvert Lining Repair (72-inch HDPE Liner in 84-inch CMP). <br />Install 72-inch HDPE Liner in existing failed 84-inch CMP culvert. <br />Cost: $300,000 to $400,000 <br />Expenditures 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total <br />Construction/Maintenance 400,000 0 0 0 0 0 0 0 0 0 400,000 <br />Total 400,000 0 0 0 0 0 0 0 0 0 400,000 <br />Funding <br />Sources 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 Total <br />Storm Water Fund 400,000 0 0 0 0 0 0 0 0 0 400,000 <br />Total 400,000 0 0 0 0 0 0 0 0 0 400,000 <br />Produced Using Plan-It CIP Software
The URL can be used to link to this page
Your browser does not support the video tag.