My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#15 - 2025 Fee Schedule
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
12-17-24
>
#15 - 2025 Fee Schedule
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2025 4:30:21 PM
Creation date
4/1/2025 12:28:07 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Plan Review Fee (Fire)65% of permit fee based on valuation of job <br />Fire Suppression 2% Value, $100.00 minimum <br />Investigation fee - Fire Suppression work started without required <br />permit Equal to permit fee amount <br />Fire Alarm 2% Value, $100.00 minimum <br />Investigation fee - Fire Alarm work started without required <br />permit Equal to permit fee amount <br />Annual Retail Consumer Fireworks (retailers only selling <br />fireworks)$350 per location <br />Annual Retail Consumer Fireworks (all other retailers)$100 per location <br />Outdoor Public Fireworks/Pyrotechnic Display $150 per location <br />Residential Day Care Inspections $50.00 <br />Residential Adult Care/Foster Care/Adoption Inspections $50.00 <br />Escrows - Building <br />Escrow Administration Fee $100.00 <br />New Single Family Dwelling Construction Escrow <br />Two or more dwelling units per building Construction Escrow <br />Commercial/Industrial and Other structures <br />Open Burning Permit <br />Residential $45.00 <br />Commercial $80.00 <br />Illegal Burn see notes →Additional fees may be incurred based on Wash. Cty. Chief's fee <br />schedule and # of responding units <br />Firefighter Standby Actual staff cost Minimum 2 hours <br />Reinspection Fee (after initial and 1st re-inspection)$75.00 <br />Inspection outside normal business hours $120.00 per hour - 2 hour minimum <br />Tent / Canopy (Over 400 sq. ft.) $75.00 per location <br />Temporary LP $80.00 per tank Plan review, inspection and operation, 180 day expiration <br />Fire Code / Policy Appeal $250.00 <br />Fire Administration Fee 4% of invoice amount <br />Chicken Keeping Permit $25.00 Initial permit expires on 12/31 of 2nd year. <br />Cannabis License/Permit State Statute Maximum allowed by State Statute <br />Comprehensive Plan Amendment $1,500.00 Land Use Escrow $2500 <br />Conditional Use Permit (CUP) <br />New $1,250.00 <br />$2,500.00 per unit, minimum $10,000 per building, or an amount as determinded by the Building <br />Official. This is not to be returned until LEC 105.08.100 Security Escrow for Construction is met. <br />Minimum $50,000 or 10% of the value of the project or an amount determined by the Building Official. <br />This can be Cash, Check or Letter of Credit in a form approved by the City. This is not to be returned <br />until LEC 105.08.100 Security Escrow for Construction is met. Planning, Building, Public Works, <br />Engineering, Fire and Finance must sign off on Escrow Release and any and all outstanding development, <br />building or other fees are to be paid or withdrawn from the remaining amount. If fees are charged against <br />this escrow it must be replenished to the minimum level of 10% of value. Financial Security shall be in <br />place in an amount to cover remaining work prior to a Building Final Inspection being scheduled. <br />Wireless Communication Facilities Fee Escrow $10,000.00. <br />Flood Plain Ordinance Fee Escrow $500.00 Land Use Escrow <br />$10,000 or an amount as determind by the Building Official. This is not to be returned until LEC <br />105.08.100 Security Escrow for Construction is met.
The URL can be used to link to this page
Your browser does not support the video tag.