Laserfiche WebLink
<br /> <br /> <br />South WTP Preliminary Site Plan <br />Watershed and storm water management. <br />Watershed divide between SWWD & VBWD. <br />Test Pumping and Well Development Discharges. <br />WTP Elevations, Underground Clear Well Storage, and Floodplain considerations. <br />Site Access. <br />Access is proposed from the existing Water Tower public R/W. <br />Access and circulation to accommodate chemical delivery and media change out operations. <br />Building Size and Elevations. <br />WTP to be approx. 150’ x 200’ located at high point. Approx. 100’ and 170’ CR setbacks. <br />Building height to be 2 - 2.5 stories. <br />Utility Piping and Layout Not Shown. <br /> <br /> <br /> <br /> <br />4