My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#04 - PW Operational Assessment Recommendation
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2025
>
05-13-25 W
>
#04 - PW Operational Assessment Recommendation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2025 4:09:35 PM
Creation date
6/17/2025 6:18:36 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />10 CITY OF LAKE ELMO, MN <br /> <br />Figure 4: MGD Water Produced per PW FTE <br /> <br />Figure 5 presents the wastewater flow per Public Works FTE. Again, the general trend is one of increasing flow rates <br />per FTE over time. Notably, this trend has also been evident from 2018 onward. Again, the reason this trend is <br />notable is that the last time the Department hired an additional Public Works Operator was in 2019, and this graph <br />is suggestive of increasing labor demands per employee. <br /> <br />0.07 <br />0.05 <br />0.06 0.06 <br />0.03 0.03 <br />0.07 <br />0.10 0.10 0.10 <br />0.11 <br />0.00 <br />0.02 <br />0.04 <br />0.06 <br />0.08 <br />0.10 <br />0.12 <br />2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 <br />MG <br />D <br /> <br />/ <br /> <br />F <br />T <br />E <br />MGD Water Produced per PW FTE
The URL can be used to link to this page
Your browser does not support the video tag.