My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-01-25 The Fresh Weekly Newsletter
LakeElmo
>
Communications
>
Newsletter - The Fresh
>
2025 The Fresh Newsletters
>
08-01-25 The Fresh Weekly Newsletter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2025 1:20:49 PM
Creation date
8/4/2025 1:20:46 PM
Metadata
Text box
ID:
1
Creator:
METRO-INET\JENNIFER.L.DOYLE
Created:
8/4/2025 1:20 PM
Modified:
8/4/2025 1:20 PM
Text:
https://storymaps.arcgis.com/stories/768f4c2ec2ae4684937432e4136ebc6c
ID:
2
Creator:
METRO-INET\JENNIFER.L.DOYLE
Created:
8/4/2025 1:20 PM
Modified:
8/4/2025 1:20 PM
Text:
https://www.washingtoncountymn.gov/2301/Phase-3-Current-Phase
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SUMMER ROAD PROJECTS <br />10th Street East of Palmer Drive to Manning Ave. will <br />close July 21 for three weeks <br />Washington County has approved a permit request for connection to <br />city utilities affecting portions of County Highway 17 (Lake Elmo Ave) <br />and County Highway 10 (10th St N) in the City of Lake Elmo. For this <br />work to occur safely, County Highway 10 must be temporarily <br />closed to all traffic between the intersections of County Highway 15 <br />(Manning Ave N) and Palmer Drive beginning Monday, July 21. <br />The closure is expected to last approximately three weeks. If, for any <br />reason, the closure is delayed or cancelled, we will update our <br />notifications as soon as possible. <br />Construction of Watermain Extension to begin June 23 <br />The city's contractor began construction of the water main extension <br />and roadway embankment for the Village Parkway crossing of the <br />Union Pacific Railroad (UPRR) on Monday, June 23, 2025. The <br />project is expected to be completed within three weeks. <br />*Update: Watermain installation beneath the tracks has been <br />completed. Roadway fill will be completed by the end of this week. <br />The contractor will demobilize from the site until UPRR completes at- <br />grade crossing improvements over the railroad tracks. <br /> <br />There will be a fair amount of truck traffic along Upper 33rd Street for <br />material delivery and construction operations. <br />Washington County / Lake Elmo Summer Road Projects <br />Washington County CSAH 13 (Inwood Ave) <br />Construction Project <br />The project continues, and all of northbound <br />CSAH 13 traffic will detour to WB CSAH 10 -> <br />NB I-694 -> EB CSAH 14 -> SB CSAH 13 -> EB <br />CSAH 6. Southbound traffic will remain <br />unrestricted. <br />To learn more about the project, visit the <br />Washington County Hwy 13 Improvement project <br />here. <br />Washington County will begin Phase 3 <br />of the County Highway 15 (Manning <br />Avenue) August 11. <br />The project includes the addition of <br />center left-turn lanes and right-turn <br />lanes at key locations, the elimination <br />of (northerly) 18th Street North access <br />to Manning, a trail connection from <br />18th Street North to 18th Street Ct, <br />and pavement rehabilitation. <br />This project is expected to be <br />completed by the end of the fall. You
The URL can be used to link to this page
Your browser does not support the video tag.