My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#18 - Station Alerting System
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2025
>
01-07-25
>
#18 - Station Alerting System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2025 2:08:46 PM
Creation date
8/4/2025 2:08:45 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 - Structural backing for system devices and other millwork (not specifically detailed) by others. <br />Warranty & Support Notes: <br />Customer must elect to choose any coverage they require beyond initial warranty period, or USDD will not be authorized to provide any service or support. Mobile <br />Smart Phone Alerting App and Mapping Services only available to customer while under warranty or elected recurring annual support. Support Agreements subject <br />to change if system design is modified. For additional details, please review current USDD Warranty Statement and Service Agreement. USDD cannot warrant nor <br />support any system configuration that deviates from this specific proposal's documented station system design file number. USDD cannot warrant nor support any <br />system not using USDD-approved UPS Battery Backup. USDD cannot warrant nor support any system not installed by G2 Trained & Certified Installation <br />technician (installer). If customer intends to tie this system into any 3rd-party system or devices, USDD will be unable to warrant or support the sytem until we've <br />had a chance to review documented engineering assumptions and approve system integrity, performance and reliability expectations. <br />For FSAaaS Program: The cost of service and support beyond initial warranty period is included in the FSASaaS Program for a total of 5 years. The service and <br />support includes Mobile Smart Phone Alerting App and Mapping Services. Please see the FSASaaS Subscription Agreement for more information concerning the <br />service and support provided by USDD. USDD cannot warrant nor support any system not using USDD-approved UPS Battery Backup. USDD cannnot warrant <br />nor support any system not installed by G2 Trained & Certified Installation technician (installer). If customer intends to tie this system into any 3rd-party system or <br />devices, USDD will be unable to warrant or support the sytem until we've had a chance to review documented engineering assumptions and approve system <br />integrity, performance and reliability expectations. <br />Station System Installation Notes: <br />13 - All communications pathway infrastructure (network, radio, etc.) by others unless specifically detailed in this proposal. <br />15 - Any misuse, unauthorized modification, improper installation, excessive shock, attempted repair, accident, or improper or negligent use, storage, transportation, <br />or handling by any party other than USDD shall render this limited warranty null, void and of no further effect <br />14 - USDD cannot warrant nor support any owner-furbished (3rd-Party) system or component we are required to integrate with. USDD cannot warrant nor support <br />any system or component it has not proofed engineering for and has not specifically authorized for use within public safety environments. <br />01 - Unless specifically detailed in this proposal, no installation by USDD or it's subcontractors is assumed or provided. <br />03 - USDD can source, qualify, train and certify Local Licensed Regional Subcontrators where needed. <br />02 - Because these are mission-critical systems, USDD can only warrant and support systems installed by G2 Trained and Certified Contractors. <br />04 - Installation warranted by installation contractor - G2 FSAS warranted, serviced and supported by USDD. <br />12 - All electrical power, including (but not limited to) raceway,conduit, backboxes, service panels, high-voltage wiring and fixtures by others. <br />11 - If applicable, Gas Control Shutoff Valve Addendum (to USDD and installation contractor) must be signed prior to installation. <br />05 - Unless specifically detailed in this proposal, installation to be performed during normal working hours. <br />09 - USDD FSAS Equipment to be made available by owner to Installation Contractor prior to on-site arrival. <br />06 - Unless specifically detailed in this proposal, no permit fees or material charges have been included. <br />07 - Unless specifically detailed in this proposal, no removal or remediation has been assumed or included. <br />08 - Unless specifically detailed in this proposal, no bonds of any type (performance, bid) have been assumed,included or budgeted for in this proposal. <br />PROPRIETARY and CONFIDENTIAL STATION 01 SYSTEM Page 3 of 3
The URL can be used to link to this page
Your browser does not support the video tag.