My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-19-25 City Council Meeting Packet
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2025
>
08-19-25 City Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2025 7:21:19 PM
Creation date
8/14/2025 7:20:17 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> STAFF REPORT <br />DATE: August 19, 2025 <br /> CONSENT <br /> <br />TO: City Council <br />FROM: Mike Rusenovich, Project Engineer <br />AGENDA ITEM: Accept Bids and Award a Contract for the 2025 Crack Seal Project <br />REVIEWED BY: Nicole Miller, City Administrator <br /> Clarissa Hadler, Finance Director <br /> Marty Powers, Public Works Director <br /> Nate Stanley, City Engineer <br /> Chad Isakson, Assistant City Engineer <br /> <br /> <br />CORE STRATEGIES: <br /> <br />☐ Vibrant, inclusive, connected community ☒ Efficient, reliable, innovative services <br />☐ Responsive, transparent, adaptive governance ☐ Balanced Finances now and future <br />☐ Managed Growth ☒ Resilient Infrastructure <br /> <br /> <br />BACKGROUND: In accordance with the City’s annual street maintenance program, certain streets have <br />been scheduled to be crack sealed in 2025. See attached Location Map. The street maintenance work <br />programmed in 2025 was reviewed jointly by Public Works and Engineering to confirm the work to be <br />completed. <br /> <br />ISSUE BEFORE COUNCIL: Should the City Council accept bids and award a contract for the 2025 <br />Crack Seal Project? <br /> <br />PROPOSAL DETAILS/ANALYSIS: Plans and specifications were completed for the 2025 Crack Seal <br />Project and contractor bids were received, publicly opened, and read aloud on Wednesday, August 13, <br />2025. An Engineer’s Letter of Recommendation and a Tabulation of Bids has been prepared and attached. <br />The City received five bids. However, the apparent lowest bidder, Asphalt Surface Technologies Corp., <br />made an error while bidding and would not be able to complete the work at their bid price. Asphalt Surface <br />Technologies Corp. has retracted their bid. <br /> <br />Of the remaining four bids, StonePros, LLC DBA SealPros provided the lowest bid of in the amount of <br />$240,855.40. Following review and verification of the bid tabulations, the City Engineer and Design <br />Engineer are recommending that the City Council award the contract to StonePros LLC DBA SealPros., as <br />outlined in the attached letter. The project was advertised on QuestCDN and in the Stillwater Gazette in <br />accordance with Minnesota competitive bidding requirements. <br /> <br />FISCAL IMPACT: Approval of this resolution commits the City to enter into a construction contract for <br />the project in the amount of $240,855.40. The project will be funded through the 2025 street maintenance <br />funds.
The URL can be used to link to this page
Your browser does not support the video tag.