Laserfiche WebLink
4 <br /> <br /> <br />RECOMMENDED FINDINGS: <br />1. That all the requirements of City Code Section 103.00.100 related to the Final Plans and Final Plat <br />have been met by the Applicant. <br />2. That the North Star 2nd Addition Final Plat and PUD Plan consists of 61 single family lots. <br />3. That the North Star 2nd Addition Final Plat and PUD is generally consistent with the Preliminary <br />Plat and PUD Plans as approved by the City of Lake Elmo on December 20, 2022. <br />4. That the North Star 2nd Addition Final Plat and PUD Plan are consistent with the intent of the 2040 <br />Lake Elmo Comprehensive Plan and the 2040 Land Use Map for this area. <br />5. That the North Star 2nd Addition Final Plat and PUD Plan complies with the general intent of the <br />Village Low Density Residential (V-LDR) zoning district with PUD modifications. <br />6. That the North Star 2nd Addition Final Plat and PUD Plan generally complies with the Lake Elmo <br />Design Guidelines and Standards Manual. <br />7. That the North Star 2nd Addition Final Plat and PUD generally complies with the City’s <br />Subdivision regulations. <br />8. That the North Star 2nd Addition Final Plat and PUD generally complies with the City’s Zoning <br />Code (including Shoreland Zoning) with the exceptions provided for in the PUD. <br />9. That the North Star 2nd Addition Final Plat and PUD Plan is generally consistent with the City’s <br />engineering standards with the exceptions noted by the City Engineer in their review comments to <br />the City dated 1/28/2025, and as otherwise identified in future reviews. <br /> <br />RECOMMENDED CONDITIONS OF APPROVAL: <br />1. Prior to the City signing or approving recording of the Final Plat or Development Agreement, the <br />Applicant shall fully address all comments in the following review memos, or any subsequently <br />revised memo, to the satisfaction of the City: <br />a. City Engineer’s memos dated 1/28/2025 <br />b. City Landscape Architect’s memo dated 1/21/2025 <br />c. City Fire Chief’s memo dated 12/20/2024 <br />d. City Attorney Plat Opinion dated 1/10/2025 <br />2. That the applicant shall obtain all necessary permits for the Subdivision Improvements including <br />but not limited to all applicable City permits (building, grading, sign, etc.), MDH, MPCA, <br />County R/W, NPDES/SWPPP permits and Valley Branch Watershed District approval before <br />starting any grading or construction activities. <br />3. No deviations are provided for signage. When construction of the subdivision monument sign is <br />desired, the Applicant must apply for a sign permit with the City and will provide a complete <br />sign plan detailing signage proposed. <br />4. The applicant/developer is responsible, at their own expense, for installing all <br />required improvements to the property and within public Right of Way. <br />5. If applicable, a storm water maintenance and easement agreement in a form acceptable to the <br />City shall be executed and recorded with the final plat. <br />6. The developer is responsible for, at their own expense, installation of the trail connection to and <br />within Legacy at Northstar. <br />7. The developer is responsible for, at their own expense, installation and relocation of the existing <br />trees impacted by the Legacy at Northstar trail connection. <br />8. The applicant shall pay required Village AUAR fee prior to release of the final plat.