My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#09 - 2025 Street Improvements
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2025
>
02-18-25
>
#09 - 2025 Street Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 9:27:22 AM
Creation date
8/15/2025 9:27:11 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2025 Street and Utility Improvements <br />FEBRUARY 18, 2025 <br />SCOPE OF IMPROVEMENTS <br />• Street and Drainage Improvements to public streets <br />• Geotechnical investigation supports reclamation of the existing roadway <br />to improve the streets in all areas if watermain is not installed. <br />• Replace existing asphalt curb with new concrete curb and gutter <br />• Inspect and repair existing storm sewer including review of extensions <br />as recommended by the engineer. <br />• NO sanitary sewer extension as part of this project – Project areas are <br />outside of MUSA <br />• Potential watermain extension areas: <br />– 59 <br />th Street N (Prairie Hamlet) <br />– 55 <br />th Street N east of Keats Ave N (Lake Elmo Vista) <br />– Irish Court N
The URL can be used to link to this page
Your browser does not support the video tag.