Laserfiche WebLink
2025 Street and Utility Improvements <br />FEBRUARY 18, 2025 <br />COST INFORMATION – WATER EXTENSION <br />55TH STREET N (LAKE ELMO VISTA) <br />• 5 Assessable Units (water) and 5.5 Assessable Units (street) <br />– One corner lot parcel uses 55 <br />th Street for access. <br />• Residential properties: Assessed per unit method. <br />• Water assessed 100% total project costs. <br />• Streets assessed 30% total project costs. <br />ESTIMATED PER UNIT <br />ASSESSED RATE <br />CITY SHARE OF <br />PROJECT COST <br />Total Estimated <br />Project Costs <br />Proposed Improvement <br />$46,000$0$230,000Watermain Improvements <br />$44,800 <br />$22,400 @ 50%$574,600$821,000Street Reconstruction <br />• $3,000 WaterAvailability Charge (WAC) per connection. <br />• $1,000 Water Connection Charge per connection. <br />• $423.65 Meter Fee (3/4” meter). <br />• $60 Permit Fee. <br />• Cost to connect your house to the stub left in the field.