Laserfiche WebLink
2025 Street and Utility Improvements <br />FEBRUARY 18, 2025 <br />COST INFORMATION – WATER EXTENSION <br />IRISH COURT NEIGHBORHOOD <br />• 7 Assessable Units (water) and 7 Assessable Units (street) <br />• Residential properties: Assessed per unit method. <br />• Water assessed 100% total project costs. <br />• Streets assessed 30% total project costs. <br />ESTIMATED PER UNIT <br />ASSESSED RATE <br />CITY SHARE OF <br />PROJECT COST <br />Total Estimated <br />Project Costs <br />Proposed Improvement <br />$20,600$0$144,200Watermain Improvements <br />$25,100$409,300$585,000Street Reconstruction <br />• $3,000 WaterAvailability Charge (WAC) per connection. <br />• $1,000 Water Connection Charge per connection. <br />• $423.65 Meter Fee (3/4” meter). <br />• $60 Permit Fee. <br />• Cost to connect your house to the stub left in the field.