Laserfiche WebLink
Nathan Fuerst, City Administrator, City of Lake Elmo <br />Oak-Land Middle School <br /> <br /> <br /> 6 of 6 <br />Appendix B <br />Irrigation Using Water from Rose Lake <br /> <br />Pump & Intake Components <br /> <br />▪ Pump & Motor, VMS, 10HP-208-230V/3Ph <br />▪ Pump Discharge Header 100HP <br />▪ Flow Meters <br />▪ Pressure Relief Valves <br />▪ Discharge Terminations <br />▪ Discharge Manifolds <br />▪ Inlet Drop Pipes <br />▪ Intake Manifolds <br />▪ Float Kits (3” HDPE Pipe) <br /> <br />Treatment Systems & Components <br /> <br />▪ UV Systems <br />▪ Discharge Filters <br />▪ Self-Cleaning Intake Screen <br /> <br />Control Panel & Components <br /> <br />▪ Control System <br />▪ Touch Screen Displays <br />▪ Surge Protection <br />▪ Optical Devices <br />▪ Electrical Enclosure (with cooling and heating) <br />▪ VFD’s <br />▪ Composite Enclosure <br />▪ Formed Steel Base <br />▪ Electrical Service <br /> <br />Storage & Distribution Components <br /> <br />▪ 6” PVC Sch. 40 Pipe (600 LF) <br />▪ Reducers <br />▪ Gate valves <br /> <br />Total Cost: $212,850.00 <br />