My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#05 - Village Pkwy Improvements
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2025
>
05-20-25
>
#05 - Village Pkwy Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 9:45:12 AM
Creation date
8/15/2025 9:45:09 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />550 Cleveland Avenue North | Saint Paul, MN 55114 <br />Phone (651) 659-9001 | (800) 972-6364 | Fax (651) 659-1379 | teamAET.com | AA/EEO <br />This document shall not be reproduced, except in full, without written approval from American Engineering Testing, Inc. <br />May 12, 2025 <br /> <br />City of Lake Elmo <br />c/o Bolton & Menk, Inc. <br />3880 Laverne Avenue North, Suite 100 <br />Lake Elmo, MN 55042 <br /> <br />Attn: Mike Rusenovich, PE – Project Engineer <br /> mike.rusenovich@bolton-menk.com <br /> <br />RE: Quality Assurance Testing Proposal <br /> Village Parkway UPRR Crossing Improvements <br /> City Project No. 2019.122 <br /> Lake Elmo, Minnesota <br /> AET Proposal No. P-0043606 <br /> <br />Dear Mr. Rusenovich: <br /> <br />Thank you for the opportunity to provide a proposal to perform testing services on the referenced <br />project. This proposal has been prepared in response to your email request on May 9, 2025, <br />and describes our understanding of the project, our anticipated scope of services, our unit rates, <br />and an estimated total fee to perform these services. <br />PROJECT INFORMATION <br />The City of Lake Elmo (the City) will be performing a street and utility improvements project <br />during the 2025 construction season. Construction is anticipated to begin at the end of May and <br />be completed by October 3, 2025. The project area will include Village Parkway at the Union <br />Pacific Railroad Crossing. The project will be funded with municipal funds. <br /> <br />Plans and Specifications were prepared by Short Elliott Hendrickson, Inc. (SEH). We understand <br />Construction Inspection and Contract Management of the project will be performed by Bolton & <br />Menk, Inc. (BMI). <br />GEOTECHNICAL INFORMATION <br />A geotechnical exploration and analysis was performed for this project by Braun Intertec. The <br />results were presented in their Geotechnical Exploration and Laboratory Testing Report, dated <br />February 13, 2024 (Braun Project No. B2311740). In the report, the site soil profile is generalized <br />as fill underlain by sandy silt and lean clay with sand. Reference should be made to that report <br />for more details regarding site conditions and recommendations.
The URL can be used to link to this page
Your browser does not support the video tag.