Laserfiche WebLink
38 GRANULAR MATERIAL BEDDING LF 60 $5.37 $322.20 $30.00 $1,800.00 <br />39 CONCRETE HYDRANT SPLASH PAD SF 10 $177.18 $1,771.80 $50.00 $500.00 <br />40 SALVAGE AND REINSTALL STORM SEWER PIPE LF 50 $62.31 $3,115.50 $80.00 $4,000.00 <br />41 SALVAGE AND REINSTALL STORM SEWER STRUCTURE EA 1 $4,444.07 $4,444.07 $2,000.00 $2,000.00 <br />42 SAWCUT BITUMINOUS PAVEMENT LF 460 $3.91 $1,798.60 $3.00 $1,380.00 <br />43 REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT SY 910 $8.33 $7,580.30 $5.00 $4,550.00 <br />44 REMOVE AND REPLACE CONCRETE CURB AND GUTTER LF 10 $32.04 $320.40 $200.00 $2,000.00 <br />45 COMMON EXCAVATION (EV) CY 440 $27.13 $11,937.20 $25.50 $11,220.00 <br />46 AGGREGATE BASE, CLASS 5 TN 220 $43.64 $9,600.80 $25.00 $5,500.00 <br />47 AGGREGATE BASE, CLASS 6 TN 100 $57.08 $5,708.00 $25.00 $2,500.00 <br />48 SELECT GRANULAR BORROW TN 550 $20.03 $11,016.50 $15.00 $8,250.00 <br />49 TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE (2,B) [SPWEA230B] - DRIVEWAY/TRAIL TN 30 $134.93 $4,047.90 $142.00 $4,260.00 <br />50 TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE (3,C) [SPWEA330C] - STREET PATCH TN 210 $143.72 $30,181.20 $151.00 $31,710.00 <br />51 TYPE SP 12.5 BITUMINOUS WEARING COURSE MIXTURE (3,C) [SPNWB330C] - STREET PATCH TN 5 $135.05 $675.25 $142.00 $710.00 <br />52 BITUMINOUS MATERIAL FOR TACK COAT GAL 50 $8.00 $400.00 $10.00 $500.00 <br />53 TOPSOIL BORROW (LV) CY 870 $37.52 $32,642.40 $22.00 $19,140.00 <br />54 SEED MIXTURE RT & EROSION CONTROL BLANKET SY 5,690 $5.70 $32,433.00 $2.15 $12,233.50 <br />55 STREET SWEEPER WITH PICK UP BROOM HR 10 $150.00 $1,500.00 $200.00 $2,000.00 <br />56 4" MULTI-COMPONENT SOLID LINE - WHITE LF 55 $3.60 $198.00 $3.60 $198.00 <br />57 4" MULTI-COMPONENT SOLID LINE - YELLOW LF 133 $3.60 $478.80 $3.60 $478.80 <br />58 6" MULTI-COMPONENT SOLID LINE - WHITE LF 121 $4.00 $484.00 $4.00 $484.00 <br />59 24" MULTI-COMPONENT SOLID LINE - YELLOW LF 28 $25.40 $711.20 $25.40 $711.20 <br />TOTAL BASE BID $1,044,814.00 $1,288,336.90