My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#12 - I-94 Lift Station and Forcemain Improvements
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2025
>
04-01-25
>
#12 - I-94 Lift Station and Forcemain Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 9:59:30 AM
Creation date
8/15/2025 9:59:21 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK ORDER NO. 27 – I-94 LIFT STATION FORCEMAIN REPLACEMENT PROJECT Page 1 of 3 <br /> <br />TASK ORDER No. 27 <br />CITY OF LAKE ELMO, MINNESOTA – BOLTON AND MENK, INC. <br />PROFESSIONAL CONSULTING SERVICES AGREEMENT <br />In accordance with ARTICLE 1 of the Master AGREEMENT between the City of Lake Elmo (“CITY”) and <br />Bolton and Menk, Inc. (“ENGINEER”), dated MARCH 20, 2013 and amended JANUARY 7, 2025 <br />(“AGREEMENT”), the ENGINEER agrees to provide Professional Consulting Support Services as <br />follows: <br />I-94 LIFT STATION FORCEMAIN REPLACEMENT PROJECT <br />PROJECT OVERVIEW: This Project includes Engineering Services for design and bidding services to <br />replace the I-94 Lift Station forcemain from the existing lift station to the northwest area of I-94 and <br />Inwood Avenue (see location map). <br />The existing forcemain has had several breaks in the last three years which required emergency <br />response and repair. The forcemain is beyond its useful life and requires replacement. The Met <br />Council is currently constructing a project which reduces the length of current forcemain but is not <br />yet complete. Due to the continued breaks it is recommended a segment of the existing forcemain is <br />replaced prior to the Met Council project completion with the limits of replacement coordinated with <br />that project. <br />The project scope includes reviewing the ultimate service area flow to the lift station, providing a <br />recommendation of the new forcemain pipe size, review of system operations under the interim <br />conditions (before Met Council completes their gravity sanitary sewer extension project), and review <br />of system operations under the post Met Council project. The existing pump and electrical panel <br />configuration will be reviewed as a part of the scope. No engineering time is included for pump, <br />electrical panel, or generator upgrades or replacements as the scope of work required is unknown at <br />this time. <br />SERVICES TO BE PROVIDED BY ENGINEER: Bolton and Menk, Inc., Inc. shall provide the following <br />Professional Engineering Services: <br />1. Project Management throughout the course of the work including submitting a weekly <br />progress memo and job to date budget form. <br />2. Topographic survey and Gopher State One Call. <br />3. Coordinate Geotechnical Investigation efforts and review the report completed for the Project <br />and incorporate recommendations as deemed appropriate <br />4. Private utility meetings and notification of potential conflicts. <br />5. Review service area with City Engineer to verify or update projected flow to the lift station. <br />6. Determine forcemain replacement limits coordinating with the Met Council project.
The URL can be used to link to this page
Your browser does not support the video tag.