3M Priority One Workgroup Lake Elmo Projects <br />Well 2 PFAS Treatment Project. <br />Contract #1: Well 2 PFAS Removal Equipment. We have been informed that a delay in <br />equipment delivery is anticipated and are working with the Contractor to mitigate impacts. <br />Contract #2: Well 2 Generator Equipment. The generator delivery date has been moved up to <br />May 13, 2025 (previously June 4). Contract #3: Well 2 Water Treatment Plant General <br />Construction Contract. Demolition work is substantially completed at Wellhouse No. 2 and the <br />contractor is starting masonry, electrical and concrete work. <br />South Water Treatment Plant (WTP) and Wells. <br />A preliminary site plan has been developed with land acquisition requirements identified, it will <br />require and acquisition of approximately 8-acres. <br />North Water Treatment Plant (WTP) for Well 4 and Well 5. <br />A draft preliminary design proposal was received by SEH and is currently under review by the <br />City Engineering team. Once the work plan and fee is finalized, staff will prepare a Planning <br />Grant through the MPCA to fund the study. The study purpose is to prepare the preliminary <br />design and Site analysis for the North Water Treatment Plant for Well 4 and Well 5. Staff is <br />currently working on preparing a MPCA grant.