My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#01 - Water Topics
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2025
>
04-08-25 W
>
#01 - Water Topics
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 10:02:39 AM
Creation date
8/15/2025 10:01:51 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3M Priority One Workgroup Lake Elmo Projects <br />Well 2 PFAS Treatment Project. <br />Contract #1: Well 2 PFAS Removal Equipment. We have been informed that a delay in <br />equipment delivery is anticipated and are working with the Contractor to mitigate impacts. <br />Contract #2: Well 2 Generator Equipment. The generator delivery date has been moved up to <br />May 13, 2025 (previously June 4). Contract #3: Well 2 Water Treatment Plant General <br />Construction Contract. Demolition work is substantially completed at Wellhouse No. 2 and the <br />contractor is starting masonry, electrical and concrete work. <br />South Water Treatment Plant (WTP) and Wells. <br />A preliminary site plan has been developed with land acquisition requirements identified, it will <br />require and acquisition of approximately 8-acres. <br />North Water Treatment Plant (WTP) for Well 4 and Well 5. <br />A draft preliminary design proposal was received by SEH and is currently under review by the <br />City Engineering team. Once the work plan and fee is finalized, staff will prepare a Planning <br />Grant through the MPCA to fund the study. The study purpose is to prepare the preliminary <br />design and Site analysis for the North Water Treatment Plant for Well 4 and Well 5. Staff is <br />currently working on preparing a MPCA grant.
The URL can be used to link to this page
Your browser does not support the video tag.